3820 Shaver St
South Houston, TX 77587 · Pasadena Independent School District
Culinary program renovation at South Houston High School
A 1,535-square-foot renovation for Pasadena ISD’s CTE culinary program is registered at South Houston High School, 3820 Shaver St. The Texas Department of Licensing and Regulation filing was submitted October 31, 2025; its status is listed as inspection complete, and the applicant’s estimated project cost is $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 31, 2025
- since Oct 31, 2025
- Largest scope
- 1,535 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Inspected · closing outPasadena ISD - 2022 Bond - CTE Culinary - South Houston High School
1,535 sq ft · $1.0M est.
- RegisteredOct 31, 2025
- Plan review
- ConstructionMar '26 – Jun '27
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project1535 sq ft pasadena isd - 2022 bond - cte culinary - south houston high school — south houston high school
TDLR project registrationRenovation/AlterationInspection Complete1,535 sq ft$1.0M est.- Project #
- TABS2026004814
- Tenant / owner
- Pasadena ISD - 2022 Bond - Cte Culinary - South Houston High School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3820 Shaver St
What is being built at 3820 Shaver St in South Houston?
A 1,535-square-foot renovation for Pasadena ISD’s CTE culinary program at South Houston High School is listed in a TDLR project registration. The filing does not describe a new standalone building.
When was the South Houston High School culinary project permitted?
The TDLR project registration was filed October 31, 2025. Its project ID is TABS2026004814, and its status is listed as inspection complete.
How much will the South Houston High School renovation cost?
The TDLR registration lists an applicant-estimated cost of $1 million for the project. This is an estimate, not a final cost.
How large is the culinary renovation at South Houston High School?
The registered project covers 1,535 square feet and is described as a renovation or alteration for the school’s CTE culinary program.
What’s happening near Wingbay on Shaver Street?
A nearby project at 3820 Shaver St is a 1,535-square-foot renovation for the CTE culinary program at South Houston High School. Wingbay is listed at 3747 Shaver St, about 169 meters away.
Is a new restaurant opening at 3820 Shaver St?
The available filing identifies a Pasadena ISD CTE culinary renovation at South Houston High School, not a restaurant opening.
Also being built nearby
All of 77587- 135 Fairmont Parkway · Mcdonald's RestaurantAug 7, 2024Mcdonald's pasadena (42-3565) — new construction — new mcdonald's restaurant with new dual lane drive-thru layout located behind the restaurant and new site work as part of the scope of work · 89 m away
- 138b Fairmont Parkway 138b · Fairpark Partners LLCAug 2, 2024Oak street health — renovation/alteration — interior build-out of an existing (recently re-built) retail suite at a strip mall · 151 m away
- 3904 S Shaver StJun 15, 20211,785 sq ft change of use to medical office · 161 m away
- 3747 Shaver St · Shaver Development LLCMar 27, 2026Wingbay - pasadena — renovation/alteration — interior lease space build-out of pizza restaurant in existing shell building · 169 m away
- 150 Fairmont Parkway · Hca Houston HealthcareSep 13, 2024Pasadena clinic — renovation/alteration — buildout into a clinic · 181 m away
- 154 Fairmont Parkway · Arc Aapsdtxoo1 LLCFeb 10, 2025Dollar tree — renovation/alteration — renovation of existing tenant retail space · 197 m away
- 3919 Freeton StOct 5, 2018Residential repair per spec list · 204 m away
- 3940 S Shaver St Bld12Jan 13, 2017Occ report/storage · 236 m away
- 3940 S Shaver St Bld14Jan 13, 2017Occ report/storage · 236 m away
- 3940 S Shaver St Bld13Jan 13, 2017Occ report/laundary/boiler room · 236 m away
- 314 E Edgebrook DrOct 19, 2020Residential foundation repair · 245 m away
- 3940 S Shaver St Bld11Sep 27, 2021Emergency habitability repairs sub bld 11 see master 19045280 · 263 m away