1201 Prairie Ridge Trl
Pflugerville, TX 78660
7.1-kW rooftop solar system permitted at Pflugerville home
A 7.1-kW rooftop solar system is being installed at this existing residence, according to a City of Austin electrical permit dated May 20, 2025. A second permit, dated May 21, 2025, covers disconnecting and reconnecting power to tie in the solar system and upgrading the main service panel to 125 amps.
Summarized from City of Austin records · updated May 21, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 21, 2025
- since May 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect - ward - disconnect/reconnect power to tie in pv component and upgrading msp to _125__ amps. _125__ main breaker
- AppliedMay 13, 2025
- IssuedMay 21, 2025
- WorkMay '25 – Jun '25
- Final inspectionJul 1, 2025
Passed final inspection Jul 1, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRequest to disconnect - ward - disconnect/reconnect power to tie in pv component and upgrading msp to _125__ amps. _125__ main breaker
Request to disconnect - ward - disconnect/reconnect power to tie in pv component and upgrading msp to _125__ amps. _125__ main breaker
City of Austin permitElectrical PermitFinal- Record
- 2025-059288 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Ward - install new _7.1__kw rooftop solar system to existing residential only using line side tap
Ward - install new _7.1__kw rooftop solar system to existing residential only using line side tap
City of Austin permitElectrical PermitFinal- Record
- 2025-059272 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1201 Prairie Ridge Trl
What is being installed at 1201 Prairie Ridge Trl?
A City of Austin permit describes a new 7.1-kW rooftop solar system at an existing residence. Permit 2025-059272 EP was filed May 20, 2025.
When was the rooftop solar system permitted?
The solar installation permit, 2025-059272 EP, was filed May 20, 2025. A related electrical permit was filed the following day.
What electrical work is planned at 1201 Prairie Ridge Trl?
Permit 2025-059288 EP covers disconnecting and reconnecting power to tie in the solar system and upgrading the main service panel to 125 amps. It was filed May 21, 2025.
How large is the solar system at this Pflugerville home?
The permit describes a 7.1-kW rooftop solar system. It was filed May 20, 2025, under permit 2025-059272 EP.
Is a new building going up at 1201 Prairie Ridge Trl?
The records describe solar and electrical work at an existing residence, not construction of a new building. The permits were filed May 20 and 21, 2025.
What permits were filed for 1201 Prairie Ridge Trl?
The City of Austin lists two electrical permits: 2025-059272 EP for a 7.1-kW rooftop solar system, filed May 20, 2025, and 2025-059288 EP for related power and panel work, filed May 21, 2025.
Is solar being installed near Unity Four 2150 Investment?
A 7.1-kW rooftop solar system is permitted at 1201 Prairie Ridge Trl, about 399 meters from Unity Four 2150 Investment at 1017 E Olympic Drive. The solar permit was filed May 20, 2025.
Also being built nearby
All of 78660- 805 Cactus Bend DrNov 27, 2023Installation of new solar system · 72 m away
- 1205 Mountain View DrDec 4, 2023Installation of solar system · 93 m away
- 1103 Prairie Ridge TrlMar 19, 2026Etj-electrical panel repair · 100 m away
- 709 Camp Fire TrlDec 19, 2023Replace meter and panel · 158 m away
- 811 Smoke Signal PassApr 4, 2024Replace meter socket and repair broken conduit to meter socket upgrade to a 200 amp service · 171 m away
- 805 Smoke Signal PassAug 30, 2024Install/replace 125 amp main panel & meter can (underground) · 184 m away
- 1115 Mountain View DrSep 12, 2024Installing generator and transfer switch also need to change meter can to approved type · 188 m away
- 1101 Mountain View DrApr 26, 2024Upgrade main electric service and install evse · 205 m away
- 614 Camp Fire TrlDec 19, 2025Request to disconnect - spears 39-19154 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. no meters being replaced only · 259 m away
- 706 Canyon Bend DrJun 29, 2026Install new _6.8__kw rooftop solar system to existing residential only using backfed breaker only · 275 m away
- 1017 Mountain View DrJun 7, 2025Request to disconnect disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 150a main breaker. not upgrading revenue meter · 311 m away
- 609 Camp Fire TrlJan 9, 2024Installing 13 405-watt solar panels roof-mounted residential for a dc system size of 5.265 kw dc · 312 m away
More solar installs in 78660.