groundranger
Recent · latest filing Dec 2025Residential

614 Camp Fire Trl

Pflugerville, TX 78660

5.7 kW rooftop solar system permitted at 614 Camp Fire Trl

Permits filed December 19, 2025, indicate a 5.7 kW rooftop solar system for the existing residence at 614 Camp Fire Trl. The work also includes disconnecting and reconnecting power to connect the solar system and upgrading the service panel to 200 amps.

Summarized from City of Austin records · updated Dec 19, 2025

Projects
2
2 filings
Latest filing
Dec 19, 2025
since Dec 19, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Request to disconnect - spears 39-19154 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. no meters being replaced only

  1. AppliedDec 18, 2025
  2. IssuedDec 19, 2025
  3. WorkDec '25 – Jan '26
  4. Final inspectionJan 16, 2026

Passed final inspection Jan 16, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Request to disconnect - spears 39-19154 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. no meters being replaced only

    Request to disconnect - spears 39-19154 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. no meters being replaced only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Spears 39-19154 - install new 5.7kw rooftop solar system to existing residential only using backfed breaker

    Spears 39-19154 - install new 5.7kw rooftop solar system to existing residential only using backfed breaker

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 614 Camp Fire Trl

What is being built at 614 Camp Fire Trl?

A City of Austin permit indicates installation of a 5.7 kW rooftop solar system at the existing residence. Permit 2025-160125 EP was filed December 19, 2025.

When was the solar project at 614 Camp Fire Trl permitted?

The two City of Austin electrical permits were filed December 19, 2025. Both are listed as final.

Is the electrical service being upgraded at 614 Camp Fire Trl?

Yes. Permit 2025-160211 EP describes disconnecting and reconnecting power to tie in the solar system and upgrading the service panel to 200 amps.

How large is the solar system planned for 614 Camp Fire Trl?

The permit describes a new 5.7 kW rooftop solar system for the existing residence.

How much will the solar installation at 614 Camp Fire Trl cost?

The available permit records do not list a project cost.

Also being built nearby

All of 78660

More solar installs in 78660.

Email me when a new permit is filed