2800 Telecom Pkwy
Richardson, TX 75082
Advocare clean manufacturing suite planned at 2800 Telecom Pkwy
A 22,000-square-foot clean manufacturing processing suite for Advocare was registered on January 2, 2024, at 2800 Telecom Pkwy in Richardson. The TDLR record describes a renovation inside an existing conditioned warehouse; the applicant estimated the project cost at $5 million. The project is listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 2, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 2, 2024
- since Jan 2, 2024
- Largest scope
- 22,000 sf
- Estimated cost
- $5.0M
- state registration
Where this project stands
CompletedClean Manufacturing Processing Suite for Advocare
22,000 sq ft · $5.0M est.
- RegisteredJan 2, 2024
- Plan review
- ConstructionJan '24 – Dec '24
- Inspected
- Closed
Ran as a 12-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectBuilding single story 22000 sq ft clean manufacturing processing suite inside existing conditioned warehouse — advocare
TDLR project registrationRenovation/AlterationProject Closed22,000 sq ft$5.0M est.- Project #
- TABS2024008429
- Tenant / owner
- Clean Manufacturing Processing Suite For Advocare
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2800 Telecom Pkwy
What is being built at 2800 Telecom Pkwy in Richardson?
A 22,000-square-foot clean manufacturing processing suite for Advocare is planned inside an existing conditioned warehouse. TDLR project registration TABS2024008429 describes the work as a renovation or alteration.
When was the Advocare project at 2800 Telecom Pkwy permitted?
The TDLR project registration was filed January 2, 2024. The record lists the project as closed.
How large is the new manufacturing suite at 2800 Telecom Pkwy?
The registered suite is 22,000 square feet. It is described as a clean manufacturing processing suite inside an existing warehouse.
How much will the Advocare project in Richardson cost?
The applicant estimated the project cost at $5 million in the TDLR registration filed January 2, 2024.
What is being built near Ulf Parc Northeast on Telecom Parkway?
A 22,000-square-foot clean manufacturing processing suite for Advocare is planned at 2800 Telecom Pkwy, about 324 meters from Ulf Parc Northeast. The TDLR record describes renovation work inside an existing conditioned warehouse.
Is a new manufacturing facility being built next to Bank of America on Telecom Parkway?
The TDLR registration describes a 22,000-square-foot clean manufacturing processing suite for Advocare at 2800 Telecom Pkwy, about 538 meters from Bank of America. The suite is planned inside an existing conditioned warehouse.
Also being built nearby
All of 75082- 2910 Telecom Parkway · Ulf Parc Northeast LPJan 19, 2026Jabil interior modifications — renovation/alteration — demolition of 10 existing production related rooms and equipment. raising of the existing lay-in ceiling to the adjacent lay-in ceiling height. all ceiling related fixtures were also raised. minimal sprinkler head repairs and modifications · 324 m away
- 2920 Telecom Parkway · Ulf Parc Northeast LPApr 28, 2026Andrew relocation — renovation/alteration — renovation of an existing building 42,810 sq ft tenant suite to include an office suite and manufacturing facility. much of the existing building construction and millwork to remain · 351 m away
- 3000 Telecom Parkway · Bank Of AmericaJun 23, 2026Bac rtx additional 4th chiller (k1010530) — renovation/alteration — demolition of a portion of existing exterior wall at mechanical yard to install wall louvers. addition of 4th chiller. mechanical yard total area is 13,926 sq ft · 538 m away