3000 Telecom Parkway
Richardson, TX 75082 · Bank Of America
A fourth chiller is planned at 3000 Telecom Parkway
A fourth chiller and wall louvers are planned for the mechanical yard at 3000 Telecom Parkway in Richardson. The Texas Department of Licensing and Regulation registered the renovation project on June 23, 2026. The applicant’s estimated project cost is $4 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 23, 2026
- since Jun 23, 2026
- Largest scope
- 13,926 sf
- Estimated cost
- $4.0M
- state registration
Where this project stands
In state plan reviewBAC RTX Additional 4th Chiller (K1010530)
13,926 sq ft · $4.0M est.
- RegisteredJun 23, 2026
- Plan reviewnow
- ConstructionAug '26 – Mar '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectDemolition of a portion of existing exterior wall at mechanical yard to install wall louvers. addition of 4th chiller. mechanical yard total area is 13,926 sq ft — bac rtx
TDLR project registrationRenovation/AlterationProject Registered13,926 sq ft$4.0M est.- Project #
- TABS2026023546
- Tenant / owner
- Bac Rtx Additional 4th Chiller (k1010530)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3000 Telecom Parkway
What is being built at 3000 Telecom Parkway?
The project registration describes adding a fourth chiller and installing wall louvers in the mechanical yard. It also calls for demolishing part of an existing exterior wall.
When was the 3000 Telecom Parkway project registered?
The Texas Department of Licensing and Regulation registered the project on June 23, 2026. Its registration number is TABS2026023546.
How much will the chiller project at 3000 Telecom Parkway cost?
The applicant’s estimated cost for the project is $4 million. This is an estimate, not a reported final cost.
How large is the mechanical yard at 3000 Telecom Parkway?
The project description gives the mechanical yard’s total area as 13,926 square feet.
What is planned near Andrew Relocation on Telecom Parkway?
A project at 3000 Telecom Parkway, about 237 meters from Andrew Relocation at 2920 Telecom Parkway, is registered for a fourth chiller and wall louvers.
What is planned near Jabil Interior Modifications on Telecom Parkway?
About 265 meters from Jabil Interior Modifications at 2910 Telecom Parkway, the project at 3000 Telecom Parkway calls for adding a fourth chiller and installing wall louvers.
Also being built nearby
All of 75082- 2920 Telecom Parkway · Ulf Parc Northeast LPApr 28, 2026Andrew relocation — renovation/alteration — renovation of an existing building 42,810 sq ft tenant suite to include an office suite and manufacturing facility. much of the existing building construction and millwork to remain · 237 m away
- 2910 Telecom Parkway · Ulf Parc Northeast LPJan 19, 2026Jabil interior modifications — renovation/alteration — demolition of 10 existing production related rooms and equipment. raising of the existing lay-in ceiling to the adjacent lay-in ceiling height. all ceiling related fixtures were also raised. minimal sprinkler head repairs and modifications · 265 m away
- 2800 Telecom PkwyJan 2, 2024Clean manufacturing processing suite for advocare — renovation/alteration — building single story 22000 sq ft clean manufacturing processing suite inside existing conditioned warehouse · 538 m away
- 3051 Research Drive · Lit Industrial Limited PartnershipDec 2, 2024Ptx8 - amazon pharmacy — renovation/alteration — 1,105 sq ft interior renovation for addition of pharmacy fulfillment space. the space contains a sortation room & an office. the fulfillment space is classifed as an accessory business use (b) · 542 m away
- 3051 Research Dr · Clarion PartnersApr 18, 2025Amazon fulfillment center stx8 - qtx1 ground paddc — new construction — new construction (located in parking lot of existing stx8 site). perimeter fencing around 2 modular structures. striping on existing pavement within fenced area for accessible circulation and launch / landing pads for delivery system · 542 m away
More demolitions in 75082.