205 Almarion Way
Rollingwood, TX 78746
60 kW generator installation permitted at 205 Almarion Way
An electrical permit indicates installation of a 60 kW generator at 205 Almarion Way, with a shutdown needed to add two 150-amp ATS/load centers. The City of Austin permit was filed on April 27, 2026, and its status is listed as Final.
Summarized from City of Austin records · updated Apr 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 27, 2026
- since Apr 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall 60 kw generator we will need a shut down to add 2 150 amp ats/load center
- AppliedApr 20, 2026
- IssuedApr 27, 2026
- WorkApr '26 – Jul '26
- Final inspectionJul 2, 2026
Passed final inspection Jul 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall 60 kw generator we will need a shut down to add 2 150 amp ats/load center
Install 60 kw generator we will need a shut down to add 2 150 amp ats/load center
City of Austin permitElectrical PermitFinal- Record
- 2026-048291 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 205 Almarion Way
What is being installed at 205 Almarion Way?
A City of Austin electrical permit describes installing a 60 kW generator and adding two 150-amp ATS/load centers.
When was the permit for 205 Almarion Way filed?
The permit was filed on April 27, 2026. Its permit number is 2026-048291 EP.
Does the work at 205 Almarion Way include transfer switches?
The permit description says two 150-amp ATS/load centers will be added. It notes that a shutdown will be needed for the work.
Is a new home being built at 205 Almarion Way?
The available permit describes generator and electrical work, not new home construction.
What is the status of the 205 Almarion Way permit?
The City of Austin lists permit 2026-048291 EP as Final.
How much will the generator project at 205 Almarion Way cost?
The available permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 78746- 2809 Rock WayFeb 23, 2026New service for sfr in etj · 50 m away
- 2802 Vance LnAug 14, 2026Install 200-amp transfer switch for 48-kw generator * disconnect and reconnect only *in ae area etj · 67 m away
- 2803 Vance LnMar 11, 2025Request to disconnect to install 26-kw generator with one 150-amp transfer switch and one 200-amp transfer switch · 77 m away
- 4 Inwood CirJun 5, 2024Installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel · 93 m away
- 2806 Hatley DrFeb 1, 2024Eud rerouting overhead to underground coming from manhole · 134 m away
- 203 Wallis DrFeb 11, 2026Install t pole · 139 m away
- 2609 Stratford DrOct 27, 2026New construction- sfr 2 story 5 bedroom 5.5 bath · 140 m away
- 2611 Stratford DrFeb 4, 2025Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas system · 148 m away
- 2607 Stratford DrMay 26, 2026Expedited review: new 2-story single family residence [5bed 5.5bath] with attached garage · 166 m away
- 301 Wallis DrSep 10, 2026Stand alone tpole permit in etj related to 2026-117785 ep · 170 m away
- 104 Wallis DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 188 m away
- 2703 Stratford DrMay 21, 2025Replacement of complete existing central heat and air system with or without duct work · 191 m away