2802 Vance Ln
Rollingwood, TX 78746
Transfer switch for 48-kW generator permitted in Rollingwood
An electrical permit indicates installation of a 200-amp transfer switch for a 48-kW generator at 2802 Vance Ln. The City of Austin issued permit 2026-103584 EP on August 14, 2026; the description says the work is disconnect and reconnect only.
Summarized from City of Austin records · updated Aug 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2026
- since Aug 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall 200-amp transfer switch for 48-kw generator * disconnect and reconnect only *in ae area etj
- AppliedAug 10, 2026
- IssuedAug 14, 2026
- WorkAug '26 – Nov '26
- Final inspectionNov 9, 2026
Passed final inspection Nov 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall 200-amp transfer switch for 48-kw generator * disconnect and reconnect only *in ae area etj
Install 200-amp transfer switch for 48-kw generator * disconnect and reconnect only *in ae area etj
City of Austin permitElectrical PermitFinal- Record
- 2026-103584 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2802 Vance Ln
What work is planned at 2802 Vance Ln in Rollingwood?
A City of Austin electrical permit covers installing a 200-amp transfer switch for a 48-kW generator. The permit description specifies disconnect and reconnect work only.
Is a new building being constructed at 2802 Vance Ln?
The available permit is for electrical work on a transfer switch, not new building construction. It was issued August 14, 2026.
What is permit 2026-103584 EP for?
Permit 2026-103584 EP covers a 200-amp transfer switch for a 48-kW generator at 2802 Vance Ln. The City of Austin record lists its status as Final.
When was the electrical permit for 2802 Vance Ln filed?
The City of Austin record is dated August 14, 2026. It is permit 2026-103584 EP.
Does the permit cover installing a generator at 2802 Vance Ln?
The permit description specifies a 200-amp transfer switch for a 48-kW generator; it does not describe installing the generator itself. It also notes disconnect and reconnect only.
Also being built nearby
All of 78746- 2803 Vance LnMar 11, 2025Request to disconnect to install 26-kw generator with one 150-amp transfer switch and one 200-amp transfer switch · 13 m away
- 205 Almarion WayApr 27, 2026Install 60 kw generator we will need a shut down to add 2 150 amp ats/load center · 67 m away
- 2809 Rock WayFeb 23, 2026New service for sfr in etj · 70 m away
- 2609 Stratford DrOct 27, 2026New construction- sfr 2 story 5 bedroom 5.5 bath · 74 m away
- 2611 Stratford DrFeb 4, 2025Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas system · 82 m away
- 2607 Stratford DrMay 26, 2026Expedited review: new 2-story single family residence [5bed 5.5bath] with attached garage · 107 m away
- 4 Inwood CirJun 5, 2024Installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel · 108 m away
- 2703 Stratford DrMay 21, 2025Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 2702 Stratford DrOct 13, 2026Replacement of garage door with modification to size. replace siding. add insulation. addition of ac mini split to rear of the garage · 165 m away
- 2606 Stratford DrJan 19, 2024Install 60kw home standby generator · 166 m away
- 2603 Stratford DrJan 27, 2009Bluffington subdivision sec 2, 2nd amended plat of lots 10 & 11, block e — bluffington subdivision, section 2, block e, lots 10 & 11 amended plat · 169 m away
- 2705 Stratford DrApr 4, 2025New construction of an 2-story single family residence with 4 bedroom 3.5 bathroom wetbar screened porch. 3-car garage is attached via covered outdoor stairwell & breezway · 170 m away