groundranger
Recent · latest filing Feb 2026Residential

2405 Rollingwood Dr

Rollingwood, TX 78746

A 26-kW natural gas whole-home generator is permitted

A permit filed February 19, 2026, covers a 26-kW natural gas generator connected to the home's gas meter and main electrical panel at 2405 Rollingwood Dr. The City of Austin electrical permit, 2026-018077 EP, is marked final.

Summarized from City of Austin records · updated Feb 19, 2026

Projects
1
1 filings
Latest filing
Feb 19, 2026
since Feb 19, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

26kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (andy davis)

  1. AppliedFeb 16, 2026
  2. IssuedFeb 19, 2026
  3. WorkFeb '26 – Mar '26
  4. Final inspectionMar 18, 2026

Passed final inspection Mar 18, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 26kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (andy davis)

    26kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (andy davis)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2405 Rollingwood Dr

What is being built at 2405 Rollingwood Dr?

A City of Austin electrical permit covers installation of a 26-kW natural gas whole-home generator connected to the house meter and main panel.

When was the generator permit filed?

The permit was filed on February 19, 2026. Its number is 2026-018077 EP.

Is the permit for a new house at 2405 Rollingwood Dr?

No new house is listed in this record. The permit is for a whole-home generator installation.

Is the generator permit at 2405 Rollingwood Dr final?

Yes. City of Austin permit 2026-018077 EP is listed with final status.

What kind of fuel will the generator use?

The permit description identifies it as a natural gas generator.

Does the generator installation require an Austin Energy disconnect?

The permit description says an Austin Energy disconnect is required.

Also being built nearby

All of 78746
Email me when a new permit is filed