500 Vale St
Rollingwood, TX 78746
New home with 33.58 kW rooftop solar planned
City of Austin records indicate new residential construction at 500 Vale St, followed by a permit for a 33.58 kW DC rooftop solar system filed March 3, 2026. Earlier electrical permits covered a temporary construction power pole in November 2024 and new-home electrical work in February 2025.
Summarized from City of Austin records · updated Mar 3, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Mar 3, 2026
- since Nov 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInstall new 33.58 kw dc rooftop solar system to new residential
- AppliedFeb 27, 2026
- IssuedMar 3, 2026
- WorkMar '26 – Dec '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstall new 33.58 kw dc rooftop solar system to new residential
Install new 33.58 kw dc rooftop solar system to new residential
City of Austin permitElectrical PermitActive- Record
- 2026-024166 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction of sfr in etj
New construction of sfr in etj
City of Austin permitElectrical PermitActive- Record
- 2025-012412 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Temp pole for power during construction
Temp pole for power during construction
City of Austin permitElectrical PermitFinal- Record
- 2024-143593 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 500 Vale St
What is being built at 500 Vale St in Rollingwood?
City of Austin permit records indicate new residential construction at the address, along with a rooftop solar installation.
Is there a solar permit for 500 Vale St?
Yes. Permit 2026-024166 EP, filed March 3, 2026, describes a 33.58 kW DC rooftop solar system for a new residence.
When was the new home at 500 Vale St permitted?
An electrical permit for new single-family residential construction in the ETJ was filed February 7, 2025. A temporary construction power pole permit was filed November 5, 2024.
What does permit 2026-024166 EP cover?
The City of Austin permit, filed March 3, 2026, covers installation of a 33.58 kW DC rooftop solar system for a new residence.
Are the permits for a commercial building at 500 Vale St?
The records describe new residential construction and a rooftop solar system, not a commercial building.
Also being built nearby
All of 78746- 2406 Rollingwood DrOct 27, 2026New residential build in etj. electrical service is austin energy. requesting permit for new overhead 320a service to rack type installation · 69 m away
- 409 Vale StSep 4, 2026Base: installing a backup battery system and additional meter socket · 93 m away
- 2405 Rollingwood DrFeb 19, 202626kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (andy davis) · 102 m away
- 404 Vale StNov 5, 2024Etj new service for new construction of sfr electrical meter install · 105 m away
- 405 Vale StMay 7, 2025Install roof mounted solar pv system 37 modules/15.17kw. with (01) anker solix backup controller 200-h 2 anker solix x1-p6k-b15-us batteries. battery capacity: 30.0 kwh · 122 m away
- 501 Riley RdJun 20, 2024New electrical service for sfr in etj · 147 m away
- 603 Riley RdFeb 23, 2024Reconnect/disconnect for austin electric- for installing generator · 199 m away
- 304 Vale StJan 23, 2026Request disconnect install 400a transocket meter feeding a 400a automatic transfer switch which will then feed 2 exterior electrical panels with 200a & 150a main circuit breakers · 246 m away
- 2602 Rollingwood DrJun 4, 2026320 amp new construction sfr in the etj · 261 m away
- 2516 Timberline DrOct 17, 2025Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 281 m away
- 401 Inwood RdFeb 15, 2025New service for sfr in etj 6764 sq ft · 321 m away
- 4707 Timberline DrNov 27, 2023New 300 amp service/ new construction · 336 m away