6 Pleasant Cv
Rollingwood, TX 78746
6 Pleasant Cv: 2 projects on record
City of Austin lists 2 filings across 2 projects at 6 Pleasant Cv, Rollingwood, TX 78746 since September 24, 2024. The most recent, filed May 19, 2025, covers: “Install 350 amp electrical service on rack etj”.
Compiled from City of Austin records · updated May 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 19, 2025
- since Sep 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall 350 amp electrical service on rack etj
- AppliedMay 14, 2025
- IssuedMay 19, 2025
- WorkMay '25 – May '25
- Final inspectionMay 23, 2025
Passed final inspection May 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall 350 amp electrical service on rack etj
Install 350 amp electrical service on rack etj
City of Austin permitElectrical PermitFinal- Record
- 2025-059778 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install home builders loop
Install home builders loop
City of Austin permitElectrical PermitFinal- Record
- 2024-127804 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6 Pleasant Cv
What is being built at 6 Pleasant Cv?
The latest filing (City of Austin permit 2025-059778 EP, May 19, 2025) covers install 350 amp electrical service on rack etj.
How many permits and filings does 6 Pleasant Cv have?
2 filings across 2 projects, from September 24, 2024 to May 19, 2025.
What is being built near Western Hills Athletic Club, in Rollingwood?
6 Pleasant Cv is about 229 m from Western Hills Athletic Club, (4801 Rollingwood Drive). Its latest filing is for install 350 amp electrical service on rack etj.
Is there other construction near 6 Pleasant Cv?
Yes. Nearby filings include 400 Wallis Dr (utility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached, Jun 29, 2026); 303 Pleasant Dr (upgrading service due to remodel etj sfr, Dec 1, 2025); 4801 Rollingwood Drive (western hills athletic club — renovation/alteration — demolition of two existing tennis courts, construction of four tennis courts in same location, modifications of the sidewalks connecting the parking lot to the clubhouse and tennis courts.approximately 50,165.19 sq ft, Aug 18, 2026).
How do I get alerts for new permits at 6 Pleasant Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 400 Wallis DrJun 29, 2026Utility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached · 148 m away
- 303 Pleasant DrDec 1, 2025Upgrading service due to remodel etj sfr · 199 m away
- 4801 Rollingwood Drive · Western Hills Athletic Club, Inc.Aug 18, 2026Western hills athletic club — renovation/alteration — demolition of two existing tennis courts, construction of four tennis courts in same location, modifications of the sidewalks connecting the parking lot to the clubhouse and tennis courts.approximately 50,165.19 sq ft · 229 m away
- 301 Wallis DrSep 10, 2026Stand alone tpole permit in etj related to 2026-117785 ep · 244 m away
- 3205 Pickwick LnSep 17, 2026Install new 150 and 200 amp ats to replace existing 2 main disconnects with matching main overcurrent protection at existing service location. install 26kw generator · 256 m away
- 314 Pleasant DrNov 6, 2025Request to disconnect upgrade overhead service to 325 amps · 263 m away
- 2810 Rollingwood DrFeb 13, 2026Install new 20.352 kw rooftop solar system and 27kw energy storage system for existing residential only · 263 m away
- 203 Wallis DrFeb 11, 2026Install t pole · 283 m away
- 104 Wallis DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 291 m away
- 2806 Hatley DrFeb 1, 2024Eud rerouting overhead to underground coming from manhole · 303 m away
- 4809 Timberline DrSep 17, 2024Etj-new ae service for sfr (2789 sq ft) · 313 m away
- 4826 Rollingwood DrNov 21, 2025Request to disconnect installing conduit and feeders from generator approx. 35 from electric service and rebuilding electric service to incorporate x2 transfer switches on existing 350a service · 316 m away