400 Wallis Dr
Rollingwood, TX 78746
12.40-kW rooftop solar system at 400 Wallis Dr
Electrical permits at 400 Wallis Dr cover installation of a grid-tied 12.40-kW solar system, filed on January 27, 2026. The system includes 31 panels and 31 Enphase microinverters. Other permits cover a main service panel upgrade on May 28, 2024, and utility disconnect/reconnect work with a Tesla gateway on June 29, 2026.
Summarized from City of Austin records · updated Jun 29, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 29, 2026
- since May 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUtility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached
- AppliedJun 24, 2026
- IssuedJun 29, 2026
- WorkJun '26 – Sep '26
- Final inspectionSep 10, 2026
Passed final inspection Sep 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsUtility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached
Utility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached
City of Austin permitElectrical PermitFinal- Record
- 2026-080867 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing a grid-tied 12.40 kw pv system. includes 31 m-solar 400w panels with 31 iq8+ enphase microinverters
Installing a grid-tied 12.40 kw pv system. includes 31 m-solar 400w panels with 31 iq8+ enphase microinverters
City of Austin permitElectrical PermitFinal- Record
- 2023-143412 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrading a main service panel per request of the city inspector in order to pass an electrical final inspection for the solar system
Upgrading a main service panel per request of the city inspector in order to pass an electrical final inspection for the solar system
City of Austin permitElectrical PermitFinal- Record
- 2024-065086 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 400 Wallis Dr
What is being installed at 400 Wallis Dr?
An Austin electrical permit describes a grid-tied 12.40-kW solar system with 31 panels and 31 Enphase microinverters. The permit was filed January 27, 2026.
When was the solar system at 400 Wallis Dr permitted?
The solar installation permit, 2023-143412 EP, is dated January 27, 2026. The records also show a related main service panel upgrade permit dated May 28, 2024.
What electrical work is planned at 400 Wallis Dr?
The permits cover a solar installation, a main service panel upgrade, and utility disconnect/reconnect work with a Tesla gateway. The latest listed permit, 2026-080867 EP, is dated June 29, 2026.
Is 400 Wallis Dr a new building project?
The records describe electrical work for a residential solar system and related service equipment. They do not describe a new building.
Is solar being installed near Western Hills Athletic Club?
The solar permits are for 400 Wallis Dr, about 253 meters from Western Hills Athletic Club at 4801 Rollingwood Drive.
Also being built nearby
All of 78746- 301 Wallis DrSep 10, 2026Stand alone tpole permit in etj related to 2026-117785 ep · 97 m away
- 203 Wallis DrFeb 11, 2026Install t pole · 137 m away
- 6 Pleasant CvMay 19, 2025Install 350 amp electrical service on rack etj · 148 m away
- 104 Wallis DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 162 m away
- 2806 Hatley DrFeb 1, 2024Eud rerouting overhead to underground coming from manhole · 164 m away
- 2809 Rock WayFeb 23, 2026New service for sfr in etj · 243 m away
- 7 Rock Way CvMar 11, 2024*request to disconnect* cdp 26kw whole home generator (natural gas) connected to house meter and main panel. no meter can required.(gerald speitel) · 243 m away
- 4801 Rollingwood Drive · Western Hills Athletic Club, Inc.Aug 18, 2026Western hills athletic club — renovation/alteration — demolition of two existing tennis courts, construction of four tennis courts in same location, modifications of the sidewalks connecting the parking lot to the clubhouse and tennis courts.approximately 50,165.19 sq ft · 253 m away
- 205 Almarion WayApr 27, 2026Install 60 kw generator we will need a shut down to add 2 150 amp ats/load center · 267 m away
- 2810 Rollingwood DrFeb 13, 2026Install new 20.352 kw rooftop solar system and 27kw energy storage system for existing residential only · 286 m away
- 303 Pleasant DrDec 1, 2025Upgrading service due to remodel etj sfr · 288 m away
- 400 Almarion DrApr 28, 2025Going from overhead to underground due to utility dig along 2803 pickwick (wo# 614061) this is a service only permit. we are not rebuilding this 350amp service only pulling in service feeders to pull box from meter and removing overhead service conduit from existing meter can. any questions please call ray martinez or bill lewis 512-2936020 · 290 m away