2801 Gattis School Road
Round Rock, TX 78641 · Round Rock Independent School District
Cedar Ridge High School plans 42,000-square-foot additions
A 40,600-square-foot, two-story classroom addition and a 2,200-square-foot dance addition are planned at Cedar Ridge High School, along with site and sports-field improvements. The project was registered with the Texas Department of Licensing and Regulation on July 1, 2026, under project number TABS2026024250.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 1, 2026
- since Jul 1, 2026
- Largest scope
- 42,000 sf
- Estimated cost
- $30M
- state registration
Where this project stands
In state plan reviewCEDAR RIDGE HIGH SCHOOL ADDITION AND RENOVATION
42,000 sq ft · $30M est.
- RegisteredJul 1, 2026
- Plan reviewnow
- ConstructionMay '27 – Nov '28
- Inspected
- Closed
Construction is scheduled to start May 18, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruction of a 40,600 sq ft two-story classroom addition, 2,200 sq ft dance addition with entry vestibule, site improvements to drainage / irrigation, sports site improvements to include turf conversion, turf replacement, and a covered batting cage. — cedar ridge high school
TDLR project registrationAdditions to Existing BuildingProject Registered42,000 sq ft$30M est.- Project #
- TABS2026024250
- Tenant / owner
- Cedar Ridge High School Addition And Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2801 Gattis School Road
What is being built at 2801 Gattis School Road?
The registered project includes a two-story classroom addition, a dance addition with an entry vestibule, drainage and irrigation improvements, sports-site work, turf work, and a covered batting cage.
Is Cedar Ridge High School getting a new classroom building?
The project registration describes a 40,600-square-foot, two-story classroom addition at the existing high school. It was filed July 1, 2026, as TABS2026024250.
Is a dance addition planned at Cedar Ridge High School?
Yes. The registration includes a 2,200-square-foot dance addition with an entry vestibule.
What sports improvements are planned at Cedar Ridge High School?
The registration lists turf conversion and replacement, other sports-site improvements, and a covered batting cage.
How much will the Cedar Ridge High School project cost?
The TDLR registration lists an estimated project cost of $30 million. This is the applicant's estimate.
What is being built near Gattis Elementary on Gattis School Road?
The Cedar Ridge High School project at 2801 Gattis School Road includes classroom and dance additions, plus site and sports improvements. Gattis Elementary is listed about 472 meters away.
Also being built nearby
All of 78641- 2651 Gattis School Road · Gattis Investments LLCOct 28, 2024Pollo rico — renovation/alteration — remodeling of 1347 s.f. restaurant building · 322 m away
- 2631 Gattis School Road · North Forest Office Space - Austin, LLCMay 29, 2024Gattis school professional center, building. 4, suite 400-405 — new construction — new construction white box build out"b" occupancy interior finish out of professional office space end unit duplex of 1,860 sq ft to be divided into 2 separate tenants; suite 400 @ 708 sq ft and suite 405 @ 968 sq ft · 335 m away
- 2631 Gattis School Rd · North Forest Office Space - Austin LLCMay 29, 2024Gattis school professional center, building. 4, suites 450-455 — new construction — new construction white box build out "b" occupancy interior finish out of professional office space end unit duplex of 1,860 sq ft to be divided into 2 separate tenants; suite 450 @ 708 sq ft and suite 455 @ 968 sq ft · 335 m away
- 2920 Round Rock Ranch Blvd · Round Rock Independent School DistrictSep 14, 2026Gattis elementary — renovation/alteration — replace hvac, update floor finishes throughout, update select wall finishes, replace plumbing fixtures. 77,427 existing s.f. no additional square footage · 472 m away
- 2261 Gattis School RoadNov 19, 2024Kanuru & swami — new construction — tenant finish-out · 580 m away
- 2261 Gattis School Rd · Skyreach Properties LLCSep 9, 2026Skyreach properties llc — additions to existing building — converting existing open space to an it office space · 580 m away