groundranger
Active · latest filing Sep 2026Commercial

2920 Round Rock Ranch Blvd

Round Rock, TX 78665 · Round Rock Independent School District

Gattis Elementary renovation filed in September 2026

A renovation at Gattis Elementary at 2920 Round Rock Ranch Blvd includes HVAC replacement, floor-finish updates, select wall-finish updates and plumbing-fixture replacement. The project was registered with TDLR on September 14, 2026, for the existing 77,427-square-foot school, with no additional square footage planned.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 14, 2026

Projects
1
1 filings
Latest filing
Sep 14, 2026
since Sep 14, 2026
Largest scope
77,427 sf
Estimated cost
$5.8M
state registration

Where this project stands

Approved · construction starts Jun 1, 2027

Gattis Elementary

77,427 sq ft · $5.8M est.

  1. RegisteredSep 14, 2026
  2. Plan review
  3. ConstructionJun '27 – Sep '28
  4. Inspected
  5. Closed

A 15-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Gattis Elementary

    Replace hvac, update floor finishes throughout, update select wall finishes, replace plumbing fixtures. 77,427 existing s.f. no additional square footage. — gattis elementary school

    TDLR project registrationRenovation/AlterationReview Complete77,427 sq ft$5.8M est.
    Tenant / owner
    Gattis Elementary
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2920 Round Rock Ranch Blvd

What is being built at 2920 Round Rock Ranch Blvd?

TDLR records describe a renovation at Gattis Elementary, including HVAC and plumbing-fixture replacement and updates to floor and select wall finishes. No additional square footage is planned.

When was the Gattis Elementary renovation filed?

The project was registered with the Texas Department of Licensing and Regulation on September 14, 2026. Its project number is TABS2027000961.

How large is the Gattis Elementary project?

The renovation covers the existing 77,427-square-foot school. The registration states that no additional square footage will be added.

What is the estimated cost of the Gattis Elementary renovation?

The TDLR registration lists an applicant-estimated project cost of $5.8 million.

What's happening near Cedar Ridge High School Addition and Renovation?

Gattis Elementary, at 2920 Round Rock Ranch Blvd, is slated for HVAC and plumbing-fixture replacement and interior finish updates. The school is about 472 meters from the Cedar Ridge High School project at 2801 Gattis School Road.

Also being built nearby

All of 78665
Email me when construction starts