2920 Round Rock Ranch Blvd
Round Rock, TX 78665 · Round Rock Independent School District
Gattis Elementary renovation filed in September 2026
A renovation at Gattis Elementary at 2920 Round Rock Ranch Blvd includes HVAC replacement, floor-finish updates, select wall-finish updates and plumbing-fixture replacement. The project was registered with TDLR on September 14, 2026, for the existing 77,427-square-foot school, with no additional square footage planned.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 14, 2026
- since Sep 14, 2026
- Largest scope
- 77,427 sf
- Estimated cost
- $5.8M
- state registration
Where this project stands
Approved · construction starts Jun 1, 2027Gattis Elementary
77,427 sq ft · $5.8M est.
- RegisteredSep 14, 2026
- Plan review
- ConstructionJun '27 – Sep '28
- Inspected
- Closed
A 15-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplace hvac, update floor finishes throughout, update select wall finishes, replace plumbing fixtures. 77,427 existing s.f. no additional square footage. — gattis elementary school
TDLR project registrationRenovation/AlterationReview Complete77,427 sq ft$5.8M est.- Project #
- TABS2027000961
- Tenant / owner
- Gattis Elementary
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2920 Round Rock Ranch Blvd
What is being built at 2920 Round Rock Ranch Blvd?
TDLR records describe a renovation at Gattis Elementary, including HVAC and plumbing-fixture replacement and updates to floor and select wall finishes. No additional square footage is planned.
When was the Gattis Elementary renovation filed?
The project was registered with the Texas Department of Licensing and Regulation on September 14, 2026. Its project number is TABS2027000961.
How large is the Gattis Elementary project?
The renovation covers the existing 77,427-square-foot school. The registration states that no additional square footage will be added.
What is the estimated cost of the Gattis Elementary renovation?
The TDLR registration lists an applicant-estimated project cost of $5.8 million.
What's happening near Cedar Ridge High School Addition and Renovation?
Gattis Elementary, at 2920 Round Rock Ranch Blvd, is slated for HVAC and plumbing-fixture replacement and interior finish updates. The school is about 472 meters from the Cedar Ridge High School project at 2801 Gattis School Road.
Also being built nearby
All of 78665- 2801 Gattis School Road · Round Rock Independent School DistrictJul 1, 2026Cedar ridge high school addition and renovation — additions to existing building — construction of a 40,600 sq ft two-story classroom addition, 2,200 sq ft dance addition with entry vestibule, site improvements to drainage / irrigation, sports site improvements to include turf conversion, turf replacement, and a covered batting cage · 472 m away
- 700 Double Creek Drive · Cnd-Double Creek, LLCMar 27, 2024Doublecreek phase 2 — new construction — 107 unit condominium project with proposed roadway, drainage, and utilities. includes internal private sidewalk along private streets · 594 m away
- 700 Double Creek Dr · Cnd-Double Creek, LLCAug 14, 2026Double creek crossing ph. 3 — new construction — residential development (5,642 sq ft of public sidewalk, 14,578 sq ft of private sidewalk, for a total of 20,220 sq ft sidewalk) · 594 m away