10 E 10th Street
San Angelo, TX 76903 · Constancio Tire & Fleet Service
Constancio Tire Storage registered in San Angelo
A 900-square-foot steel storage structure for Constancio Tire & Fleet Service was registered as new construction on April 17, 2024. The TDLR record describes a 30-by-30-foot structure with a concrete slab and limestone foundation pad. The applicant’s estimated project cost is $100,000.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 17, 2024
- since Apr 17, 2024
- Largest scope
- 900 sf
- Estimated cost
- $100K
- state registration
Where this project stands
In state plan reviewConstancio Tire Storage
900 sq ft · $100K est.
- RegisteredApr 17, 2024
- Plan reviewnow
- ConstructionApr '24 – Jun '24
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 1 phone number
Permit & project history
1 project30'x30'x14" steel structure with 6" limestone foundation pad. 30'x30'x5.5" concrete slab. structure will be constructed of 8" 10 lb i beam, 12" 14 lb i beam, 8" c purlin, and r panel sheet metal. — constancio tire & fleet service
TDLR project registrationNew ConstructionProject Registered900 sq ft$100K est.- Project #
- TABS2024016441
- Tenant / owner
- Constancio Tire Storage
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 10 E 10th Street
What is being built at 10 E 10th Street in San Angelo?
A 900-square-foot steel storage structure for Constancio Tire & Fleet Service was registered as new construction. The TDLR filing, TABS2024016441, is dated April 17, 2024.
Is Constancio Tire Storage a new building?
The TDLR record classifies Constancio Tire Storage as new construction. It describes a 30-by-30-foot steel structure with a concrete slab and limestone foundation pad.
How large is the Constancio Tire Storage project?
The registered project is 900 square feet, with dimensions of 30 by 30 feet, according to the April 17, 2024 TDLR filing.
How much will the Constancio Tire Storage project cost?
The applicant’s estimated cost for the project is $100,000, according to TDLR registration TABS2024016441.
What is being built near Galilee CDC in San Angelo?
A 900-square-foot steel storage structure for Constancio Tire & Fleet Service was registered at 10 E 10th Street, about 352 meters from Galilee CDC at 218 West 9th Street. The TDLR registration is dated April 17, 2024.
When was the Constancio Tire Storage project registered?
The project was registered with the Texas Department of Licensing and Regulation on April 17, 2024. Its project number is TABS2024016441.
Also being built nearby
All of 76903- 218 West 9th Street · Galilee CdcApr 14, 2025Ninth street apartment renovation — renovation/alteration — renovate existing apartment building to create (8) units approx 2400 sq ft per floor, two floors · 352 m away
- 410 North Chadbourne St · Diocese Of San Angelo (dosa,llc)Apr 3, 2025Catholic outreach services - cooler addition — additions to existing building — addition of a 92 sq ft stand-alone walk in cooler to the rear of the building. there will be a concrete foundation below the cooler and a new door opening will be cut in the building for entry into the new cooler · 509 m away
- 216 West 5th Street · Extreme All Star GymApr 23, 2025Extreme all star gym — renovation/alteration — adding 2 bathrooms, closet and some retail areas as well as some mechanical work · 541 m away