216 West 5th Street
San Angelo, TX 76903 · Extreme All Star Gym
Extreme All Star Gym renovation adds bathrooms and retail areas
A 2,800-square-foot renovation at Extreme All Star Gym is planned for 216 West 5th Street in San Angelo. The project was registered with the Texas Department of Licensing and Regulation on April 23, 2025, and includes two bathrooms, a closet, retail areas and mechanical work.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 23, 2025
- since Apr 23, 2025
- Largest scope
- 2,800 sf
- Estimated cost
- $100K
- state registration
Where this project stands
Finishing up · inspection nextExtreme All Star Gym
2,800 sq ft · $100K est.
- RegisteredApr 23, 2025
- Plan review
- ConstructionApr '25 – May '25
- Inspectednow
- Closed
Scheduled to finish May 30, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectAdding 2 bathrooms, closet and some retail areas as well as some mechanical work. — extreme all star gym
TDLR project registrationRenovation/AlterationReview Complete2,800 sq ft$100K est.- Project #
- TABS2025017291
- Tenant / owner
- Extreme All Star Gym
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 216 West 5th Street
What is being built at 216 West 5th Street in San Angelo?
A renovation at Extreme All Star Gym is planned, including two bathrooms, a closet, some retail areas and mechanical work. The TDLR project registration was filed April 23, 2025.
Is Extreme All Star Gym being renovated?
Yes. The TDLR registration describes a 2,800-square-foot renovation and alteration at the gym, with work including bathrooms, retail areas and mechanical changes.
When was the Extreme All Star Gym project filed?
The project registration, TABS2025017291, was filed with the Texas Department of Licensing and Regulation on April 23, 2025.
How much will the Extreme All Star Gym renovation cost?
The TDLR registration lists an estimated project cost of $100,000. This is the applicant’s estimate.
What's being renovated near Spec Office Warehouse in San Angelo?
Extreme All Star Gym, at 216 West 5th Street, has a registered renovation project that includes two bathrooms, a closet, retail areas and mechanical work. Spec Office Warehouse is listed at 301 W. 3rd Street, about 231 meters away.
Does the Extreme All Star Gym project include retail space?
Yes. The project description says it includes some retail areas, along with two bathrooms, a closet and mechanical work.
Also being built nearby
All of 76903- 301 W. 3rd Street · Spec Office WarehouseJan 2, 2024Spec office warehouse — new construction — 2,420 sq ft new construction office warehouse · 231 m away
- 218 West 9th Street · Galilee CdcApr 14, 2025Ninth street apartment renovation — renovation/alteration — renovate existing apartment building to create (8) units approx 2400 sq ft per floor, two floors · 342 m away
- 410 North Chadbourne St · Diocese Of San Angelo (dosa,llc)Apr 3, 2025Catholic outreach services - cooler addition — additions to existing building — addition of a 92 sq ft stand-alone walk in cooler to the rear of the building. there will be a concrete foundation below the cooler and a new door opening will be cut in the building for entry into the new cooler · 391 m away
- 105 North Koenigheim Street · Vista Two Partners LLCOct 26, 2026Discount tire txw 06 — renovation/alteration — remodel of existing store - approx. 1,578 sq ft update finishes and fixtures · 428 m away
- 228 North ChadbourneOct 28, 2025Tenashi build out — renovation/alteration — building was originally used as a warehouse. it's an empty building, no plumbing or electrical. we'll be doing a full renovation adding walls, plumbing, new roof, everything necessary to be operational · 449 m away
- 10 E 10th Street · Constancio Tire & Fleet ServiceApr 17, 2024Constancio tire storage — new construction — 30'x30'x14" steel structure with 6" limestone foundation pad. 30'x30'x5.5" concrete slab. structure will be constructed of 8" 10 lb i beam, 12" 14 lb i beam, 8" c purlin, and r panel sheet metal · 541 m away
- 61 N Chadbourne · Billy Is Shoes LLCAug 24, 2026Birdies — renovation/alteration — renovate the existing 2,400 square foot building into a functional golf entertainment venue. the scope includes structural modifications, interior build-out, and finishes to support three golf simulators, restrooms, and a lounge area · 553 m away
- 16 N Chadbourne · 16 N Chadbourne RemodelJan 24, 202516 n chadbourne st. — renovation/alteration — remodel/finish out of vacant tenant space, approx 1,850sqft · 572 m away
- 319 W Harris Ave · Citizen State BankMar 26, 20252501- csb- interior reno — renovation/alteration — 1700 sq ft of demolition existing walls frame new walls new ceiling and floors · 595 m away