105 Auditorium Circle
San Antonio, TX 78205 · At&t 105 Aud. Elevator Modernization, At&t 105 Auditorium Cir. Riser Isolation Switches + 1 more
Renovation work targets elevator and electrical systems
Renovation work at the multi-tenant building at 105 Auditorium Circle covers elevator-room modifications, electrical isolation switches on medium-voltage risers, and expansion of an 11th-floor power-control room. TDLR project registrations were filed September 26 and October 3, 2023, and March 22, 2024.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 22, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Mar 22, 2024
- since Mar 22, 2024
- Largest scope
- 3,000 sf
- Estimated cost
- $5.3M
- state registration
Where this project stands
Finishing up · inspection nextAT&T 105 AUD. ELEVATOR MODERNIZATION
3,000 sq ft · $2.7M est.
- RegisteredMar 22, 2024
- Plan review
- ConstructionApr '24 – Dec '24
- Inspectednow
- Closed
Scheduled to finish Dec 31, 2024; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
3 projectsElevator room modifications — at&t 105 aud
TDLR project registrationRenovation/AlterationReview Complete3,000 sq ft$2.7M est.- Project #
- TABS2024014469
- Tenant / owner
- At&t 105 Aud. Elevator Modernization
- Design firm
- Pro
- Contact
- Pro
Project involves the installation of electrical isolation switches on medium voltage electrical risers serving critical loads throughout the facility. — at&t san antonio capitol building
TDLR project registrationRenovation/AlterationReview Complete100,000 sq ft$5.3M est.- Project #
- TABS2024002322
- Tenant / owner
- At&t 105 Auditorium Cir. Riser Isolation Switches
- Design firm
- Pro
- Contact
- Pro
Interior remodel for power room expansion. — san antonio capitol building
TDLR project registrationRenovation/AlterationReview Complete702 sq ft$150K est.- Project #
- TABS2024001781
- Tenant / owner
- Att - 11th Floor Power Control Room
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 105 Auditorium Circle
What is being built at 105 Auditorium Circle?
TDLR registrations describe renovations to elevator, electrical, and power-control spaces in the multi-tenant building. The records do not describe a new building.
What renovations are planned at 105 Auditorium Circle?
The work includes elevator-room modifications, installation of electrical isolation switches on medium-voltage risers, and expansion of an 11th-floor power-control room.
When were the projects at 105 Auditorium Circle registered?
The TDLR records were filed September 26, 2023, October 3, 2023, and March 22, 2024. The March 2024 registration, TABS2024014469, covers elevator-room modifications.
Are the 105 Auditorium Circle projects new construction?
No. All three TDLR registrations classify the work as renovation or alteration.
What electrical work is listed at 105 Auditorium Circle?
A TDLR registration filed October 3, 2023, describes electrical isolation switches on medium-voltage risers serving critical loads throughout the facility. Its project number is TABS2024002322.
What is being renovated near Trestle - Tlc El Tropicano?
At 105 Auditorium Circle, about 116 meters from the listed landmark, TDLR records describe elevator-room, riser-switch, and power-control-room work. The registrations were filed from September 2023 through March 2024.
Also being built nearby
All of 78205- 105 Auditorium Cir · 105 Auditorium CirMay 6, 20269th & 11th floor aon renovation — renovation/alteration — the development of a “white space” for installation of new telecom racks on the 9th floor and addition of hvac and electrical system to serve the room. on the 11th floor, the existing open space will be utilized to house new electrical substation, an
- 110 Lexington Ave · Trestle - Tlc El Tropicano, LPMay 20, 2024El tropicano hotel renovation — renovation/alteration — full interior remodel of an existing hotel that has been vacant since 2020 · 116 m away
- 300 Convent · 300 Convent, LLCOct 10, 2024Level 6 spec suite and common area — renovation/alteration — interior finish out for office · 140 m away
- 300 Convent St Level 21 And 22 · 300 Convent LLCAug 16, 2024Amegy bank san antonio — renovation/alteration — renovation of level 21 and level 22 office tenant suite space · 140 m away
- 500 Mccullough Avenue · City Public Energy ServiceDec 1, 2025Cps hq 11th floor new multipurpose room — renovation/alteration — enclose 750 sq ft of open office area with purchased modular walls to create multi-purpose space for staff · 258 m away
- 500 Mccullough Avenue · City Public Service EnergyMar 28, 2025Cps energy headquarters 9th flr finishout — new construction — interior office finish out of previous shell space including new restrooms, break broom conference rooms · 258 m away
- 100 Taylor Street · H5 100Oct 22, 2025H 2nd floor restroom renovation — renovation/alteration — renovation of existing restroom · 273 m away
- 112 E Pecan Street · Santa Clara Land Company, Ltd.Apr 6, 2026Pnc bank weston centre restroom renovation — renovation/alteration — restroom remodel of existing restrooms and addition of one unisex toilet room. total square footage approximately 410 sq ft · 357 m away
- 112 E Pecan · Santa Clara Land Company, LtdMar 27, 2024Kronkosky charitable foundation — renovation/alteration — interior remodel · 357 m away
- 112 E. Pecan St · Santa Clara Land Co LtdSep 24, 2026Visit san antonio — renovation/alteration — interior remodel of office space · 357 m away
- 711 Navarro Street · Tpp Epa, LLCAug 1, 2024Wiss, janney, elstner associates — renovation/alteration — interior renovation of office space · 363 m away
- 711 Navarro Street · Tpp Epa LLCFeb 2, 2026Kairoi residential office — renovation/alteration — renovation of a portion of the 6th floor of an existing office building into a new 7,680 sq ft office. portions of the existing floor will need to be demolished in preparation for new partitions, ceilings, finishes, mechanical, electrical and plumbing · 363 m away