445 Main Avenue
San Antonio, TX 78205 · Art Pace, Inc.
Art Pace rooftop solar canopy and bar area planned
A project at 445 Main Avenue calls for steel framing for a rooftop solar canopy, plus a bar/service area, restrooms and storage. The TDLR project registration was filed October 14, 2024; it lists 3,915 square feet and an applicant-estimated cost of $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 14, 2024
- since Oct 14, 2024
- Largest scope
- 3,915 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Finishing up · inspection nextArt Pace Rooftop Solar Canopy
3,915 sq ft · $1.0M est.
- RegisteredOct 14, 2024
- Plan review
- ConstructionNov '24 – Jan '25
- Inspectednow
- Closed
Scheduled to finish Jan 31, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectSteel framing for rooftop solar canopy (solar by others) and the addition of a bar/service area, restroom facilities, and a storage area. — art pace
TDLR project registrationAdditions to Existing BuildingReview Complete3,915 sq ft$1.0M est.- Project #
- TABS2025003084
- Tenant / owner
- Art Pace Rooftop Solar Canopy
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 445 Main Avenue
What is being built at 445 Main Avenue in San Antonio?
The Art Pace project registration describes steel framing for a rooftop solar canopy, along with a bar/service area, restrooms and storage. It was filed with TDLR on October 14, 2024.
Is a new restaurant opening at 445 Main Avenue?
The TDLR registration lists a bar/service area, restrooms and storage, but does not say that a new restaurant is opening.
Will 445 Main Avenue get rooftop solar panels?
The project calls for steel framing for a rooftop solar canopy, with solar work by others, according to the TDLR registration.
How big is the Art Pace project at 445 Main Avenue?
The TDLR registration lists the project at 3,915 square feet.
How much will the 445 Main Avenue project cost?
The TDLR registration gives an applicant-estimated cost of $1 million. This is an estimate, not a confirmed final project cost.
What is being built near City of San Antonio EDD at 600 Soledad Street?
About 194 meters away, the Art Pace project at 445 Main Avenue calls for a rooftop solar canopy frame and additions including a bar/service area, restrooms and storage.
Also being built nearby
All of 78205- 600 Soledad St · City Of San Antonio - EddMar 21, 2024Launch sa — renovation/alteration — interior wall reconfiguration, update interior paint colors, upgraded 2x2 fixtures to led, move light switches and power outlets in a 7000 sq ft space on the 1st floor · 194 m away
- 327 N. Flores St · San Antonio Housing Authority (opportunity Homes San Antonio)Jun 18, 2026Villa hermosa mechanical, electrical, plumbing, and fire upgrades — renovation/alteration — replacement of existing mechanical hvac system, plumbing system, electrical system and lighting, fire sprinkler system and new ceilings in the apartments of this 59,500 sq ft 5-story existing building · 206 m away
- 112 E. Pecan St · Santa Clara Land Co LtdSep 24, 2026Visit san antonio — renovation/alteration — interior remodel of office space · 217 m away
- 112 E Pecan · Santa Clara Land Company, LtdMar 27, 2024Kronkosky charitable foundation — renovation/alteration — interior remodel · 217 m away
- 112 E Pecan Street · Santa Clara Land Company, Ltd.Apr 6, 2026Pnc bank weston centre restroom renovation — renovation/alteration — restroom remodel of existing restrooms and addition of one unisex toilet room. total square footage approximately 410 sq ft · 217 m away
- 111 W Travis St · 111 W Travis Aqre,lpOct 1, 2026111 w travis — additions to existing building — renovation of existing 10-story, 63-unit multifamily building with basement, including unit/common-area renovations, accessibility, mep/life-safety upgrades, historic exterior/window/storefront rehabilitation, and site/courtyard improvements. include · 218 m away
- 151 E. Travis St · International Bank Of CommerceApr 10, 2025Bank parking lot — new construction — parking lot with 18 stalls. +/- 6,810 sq ft of new asphalt pavement. +/- 320 lf of curbing · 232 m away
- 611 N. Main Avenue · San Antonio Independent School DistrictDec 3, 2025Bond 2020 fox tech campus additions & renovations west parking lot — new construction — this project consists of the demolition of an existing 2,900 square foot building adjacently located to north flores street on the west side of secondary gymnasium and south of the soccer field. the project includes site clearance for the design of a · 258 m away
- 130 E. Travis Street · International Bank Of CommerceApr 23, 2026Jw marriott san antonio river walk — renovation/alteration — renovation/new addition to an existing 13 story tower for a new 301 guestroom hotel, restaurant bar, ballrooms, meeting rooms, exterior roof top pool/terrace. the existing building will be renovate to house the 301 guestroom and an additional tower · 279 m away
- 130 E Travis St · International Bank Of CommerceSep 22, 2025Centre ii - 3rd floor renovation — renovation/alteration — a partial interior renovation of the entire 3rd floor of 5,640 sq ft new waiting areas, reception, offices and break room · 279 m away
- 637 N Main Ave · Fox Tech CampusJul 12, 2024Saisd bond 2020 fox tech campus additions & renovations — renovation/alteration — renovations and additions of numerous buldings including parking · 307 m away
- 405 N St. Mary Street · Travis BuildingApr 2, 2024Dunkin travis building — renovation/alteration — interior buildout of a dunkin donut shop · 321 m away
More warehouses & industrial in 78205, restaurants in 78205, solar installs in 78205.