611 N. Main Avenue
San Antonio, TX 78205 · San Antonio Independent School District
Fox Tech west parking lot project registered in 2025
A Fox Tech campus west parking lot project is planned at 611 N. Main Avenue in San Antonio. A TDLR registration dated December 3, 2025, describes demolishing an existing 2,900-square-foot building and clearing the site; it lists the project as new construction. The applicant’s estimated project cost is $800,000.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 3, 2025
- since Dec 3, 2025
- Largest scope
- 12,525 sf
- Estimated cost
- $800K
- state registration
Where this project stands
Finishing up · inspection nextBond 2020 Fox Tech Campus Additions & Renovations West Parking Lot
12,525 sq ft · $800K est.
- RegisteredDec 3, 2025
- Plan review
- ConstructionJan '26 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectThis project consists of the demolition of an existing 2,900 square foot building adjacently located to north flores street on the west side of secondary gymnasium and south of the soccer field. the project includes site clearance for the design of a — fox tech campus
TDLR project registrationNew ConstructionReview Complete12,525 sq ft$800K est.- Project #
- TABS2026007177
- Tenant / owner
- Bond 2020 Fox Tech Campus Additions & Renovations West Parking Lot
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 611 N. Main Avenue
What is being built at 611 N. Main Avenue?
A TDLR registration names a Fox Tech campus west parking lot project. It describes demolition of an existing 2,900-square-foot building and site clearance.
When was the Fox Tech west parking lot project registered?
The project was registered with the Texas Department of Licensing and Regulation on December 3, 2025. Its registration number is TABS2026007177.
Is a building being demolished at 611 N. Main Avenue?
The project description says an existing 2,900-square-foot building will be demolished. It places the building north of North Flores Street, west of the secondary gymnasium, and south of the soccer field.
How much will the Fox Tech campus project cost?
The TDLR registration lists an applicant estimate of $800,000 for the project. This is an estimate, not a confirmed final cost.
What is happening near Regus & Board Room on North Main?
The Fox Tech campus west parking lot project is registered at 611 N. Main Avenue, about 86 meters from Regus & Board Room at 660 N. Main. Its December 3, 2025, TDLR registration describes demolition and site clearance.
Also being built nearby
All of 78205- 637 N Main Ave · Fox Tech CampusJul 12, 2024Saisd bond 2020 fox tech campus additions & renovations — renovation/alteration — renovations and additions of numerous buldings including parking · 49 m away
- 660 N Main · 660 N MainMay 11, 2026Regus & board room — renovation/alteration — interior finish out for office use · 86 m away
- 600 Soledad St · City Of San Antonio - EddMar 21, 2024Launch sa — renovation/alteration — interior wall reconfiguration, update interior paint colors, upgraded 2x2 fixtures to led, move light switches and power outlets in a 7000 sq ft space on the 1st floor · 103 m away
- 111 Dallas St. San Antonio, TX 78205 · Vhs San Antonio Partners LLCJun 16, 2025Cath lab #2 equipment replacement — renovation/alteration — cath lab equipment replacement with updated finishes, ceiling, doors, millwork, electrical fixtures, flooring and partitions · 196 m away
- 111 Dallas St · Vhs San Antonio Partners LLCDec 19, 2025Bronchoscopy renovation — renovation/alteration — conversion of existing operating room to new bronchoscopy room and existing ante room into new housekeeping. demolition work for new walls, ceilings, lights, plumbing fixtures, casework. new walls, ceilings, lights, mechanical fan & medgas · 196 m away
- 111 Dallas Street · Baptist Medical CenterJul 5, 2024Chiller — renovation/alteration — to install an additional 850 ton chiller, ch-2. a new chilled water pump and new condenser water pump will be installed. to accommodate installation of the new chiller, a new aluminum storefront will be installed after chiller is installation · 196 m away
- 730 N Main · Vhs San Antonio Partners, LLCOct 24, 2025Healthlink — renovation/alteration — interior finish out / renovation · 239 m away
- 445 Main Avenue · Art Pace, Inc.Oct 14, 2024Art pace rooftop solar canopy — additions to existing building — steel framing for rooftop solar canopy (solar by others) and the addition of a bar/service area, restroom facilities, and a storage area · 258 m away
- 112 E. Pecan St · Santa Clara Land Co LtdSep 24, 2026Visit san antonio — renovation/alteration — interior remodel of office space · 405 m away
- 112 E Pecan · Santa Clara Land Company, LtdMar 27, 2024Kronkosky charitable foundation — renovation/alteration — interior remodel · 405 m away
- 112 E Pecan Street · Santa Clara Land Company, Ltd.Apr 6, 2026Pnc bank weston centre restroom renovation — renovation/alteration — restroom remodel of existing restrooms and addition of one unisex toilet room. total square footage approximately 410 sq ft · 405 m away
- 215 E. Quincy St · Vhs San Antonio Partners LLCSep 1, 2026Suite 610 — renovation/alteration — interior renovation · 420 m away