111 Dallas St. San Antonio, TX 78205
San Antonio, TX 78205 · Vhs San Antonio Partners LLC
Cath Lab #2 equipment replacement at Baptist Medical Center
A renovation to replace equipment in Cath Lab #2 at Baptist Medical Center is registered for 111 Dallas St. The TDLR project registration was filed June 16, 2025, and describes updated finishes, ceiling, doors, millwork, electrical fixtures, flooring and partitions across 1,100 square feet.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 16, 2025
- since Jun 16, 2025
- Largest scope
- 1,100 sf
- Estimated cost
- $1.7M
- state registration
Where this project stands
CompletedCath Lab #2 Equipment Replacement
1,100 sq ft · $1.7M est.
- RegisteredJun 16, 2025
- Plan review
- ConstructionJul '25 – Nov '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectCath lab equipment replacement with updated finishes, ceiling, doors, millwork, electrical fixtures, flooring and partitions — baptist medical center
TDLR project registrationRenovation/AlterationProject Closed1,100 sq ft$1.7M est.- Project #
- TABS2025021376
- Tenant / owner
- Cath Lab #2 Equipment Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 111 Dallas St. San Antonio, TX 78205
What is being built at 111 Dallas St. in San Antonio?
A renovation is replacing equipment in Cath Lab #2 at Baptist Medical Center, with updates to finishes and interior elements. The TDLR registration, filed June 16, 2025, lists the project as closed.
Is a new building going up at 111 Dallas St.?
No new building is described in the TDLR record. It identifies the work as a renovation and alteration of an existing cath lab.
When was the Cath Lab #2 project permitted?
The TDLR project registration was filed June 16, 2025. The project is listed as closed under registration number TABS2025021376.
How much will the Cath Lab #2 renovation cost?
The applicant's estimated cost for the project is $1.7 million. This is an estimate, not a confirmed final cost.
How large is the Cath Lab #2 renovation?
The TDLR registration lists the project area as 1,100 square feet.
What's being renovated near Baptist Medical Center on Dallas Street?
The Cath Lab #2 equipment replacement is at Baptist Medical Center, listed at 111 Dallas Street. The work includes new equipment and updates to finishes, ceiling, doors, millwork, electrical fixtures, flooring and partitions.
Also being built nearby
All of 78205- 111 Dallas St · Vhs San Antonio Partners LLCDec 19, 2025Bronchoscopy renovation — renovation/alteration — conversion of existing operating room to new bronchoscopy room and existing ante room into new housekeeping. demolition work for new walls, ceilings, lights, plumbing fixtures, casework. new walls, ceilings, lights, mechanical fan & medgas
- 111 Dallas Street · Baptist Medical CenterJul 5, 2024Chiller — renovation/alteration — to install an additional 850 ton chiller, ch-2. a new chilled water pump and new condenser water pump will be installed. to accommodate installation of the new chiller, a new aluminum storefront will be installed after chiller is installation
- 660 N Main · 660 N MainMay 11, 2026Regus & board room — renovation/alteration — interior finish out for office use · 137 m away
- 637 N Main Ave · Fox Tech CampusJul 12, 2024Saisd bond 2020 fox tech campus additions & renovations — renovation/alteration — renovations and additions of numerous buldings including parking · 165 m away
- 730 N Main · Vhs San Antonio Partners, LLCOct 24, 2025Healthlink — renovation/alteration — interior finish out / renovation · 167 m away
- 611 N. Main Avenue · San Antonio Independent School DistrictDec 3, 2025Bond 2020 fox tech campus additions & renovations west parking lot — new construction — this project consists of the demolition of an existing 2,900 square foot building adjacently located to north flores street on the west side of secondary gymnasium and south of the soccer field. the project includes site clearance for the design of a · 196 m away
- 600 Soledad St · City Of San Antonio - EddMar 21, 2024Launch sa — renovation/alteration — interior wall reconfiguration, update interior paint colors, upgraded 2x2 fixtures to led, move light switches and power outlets in a 7000 sq ft space on the 1st floor · 226 m away
- 215 E. Quincy St · Vhs San Antonio Partners LLCSep 1, 2026Suite 610 — renovation/alteration — interior renovation · 267 m away
- 105 Auditorium Circle · At&t Services, Inc.Mar 22, 2024At&t 105 aud. elevator modernization — renovation/alteration — elevator room modifications · 384 m away
- 105 Auditorium Cir · 105 Auditorium CirMay 6, 20269th & 11th floor aon renovation — renovation/alteration — the development of a “white space” for installation of new telecom racks on the 9th floor and addition of hvac and electrical system to serve the room. on the 11th floor, the existing open space will be utilized to house new electrical substation, an · 384 m away
- 445 Main Avenue · Art Pace, Inc.Oct 14, 2024Art pace rooftop solar canopy — additions to existing building — steel framing for rooftop solar canopy (solar by others) and the addition of a bar/service area, restroom facilities, and a storage area · 420 m away
- 300 Convent St Level 21 And 22 · 300 Convent LLCAug 16, 2024Amegy bank san antonio — renovation/alteration — renovation of level 21 and level 22 office tenant suite space · 431 m away