groundranger
Historic · latest filing May 2024Commercial

217 Newell

San Antonio, TX 78215 · Oxbow Development Group

Pedestrian bridge planned across the San Antonio River

A pedestrian bridge is planned from the surface parking lot at 217 Newell to a pedestrian promenade on the river’s west bank. The Texas Department of Licensing and Regulation registration, filed May 15, 2024, also describes relocating an existing pedestrian path at river level. The applicant’s estimated project cost is $924,305.

Summarized from Texas Department of Licensing and Regulation records · updated May 15, 2024

Projects
1
1 filings
Latest filing
May 15, 2024
since May 15, 2024
Largest scope
16,350 sf
Estimated cost
$924K
state registration

Where this project stands

Completed

Pearl South Bridge

16,350 sq ft · $924K est.

  1. RegisteredMay 15, 2024
  2. Plan review
  3. ConstructionJul '24 – Mar '25
  4. Inspected
  5. Closed

Ran as a 8-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Pearl South Bridge

    (16,350) constructing a pedestrian bridge across the san antonio river from the surface parking lot at 217 newell avenue to a pedestrian promenade on the west bank of the river. will require relocation of existing pedestrian path at river level. — pearl south bridge

    TDLR project registrationNew ConstructionProject Closed16,350 sq ft$924K est.
    Tenant / owner
    Pearl South Bridge
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 217 Newell

What is being built at 217 Newell in San Antonio?

A TDLR project registration describes a pedestrian bridge crossing the San Antonio River from the surface parking lot at 217 Newell to a pedestrian promenade on the west bank.

When was the pedestrian bridge at 217 Newell permitted?

The project was registered with the Texas Department of Licensing and Regulation on May 15, 2024. Its registration number is TABS2024018617.

Where will the bridge at 217 Newell connect?

The registered project connects the surface parking lot at 217 Newell with a pedestrian promenade on the west bank of the San Antonio River.

Will the 217 Newell bridge project change the river-level path?

The project description says an existing pedestrian path at river level will need to be relocated.

How much will the 217 Newell pedestrian bridge cost?

The applicant estimated the project cost at $924,305. This is an estimate for the project, not a final reported cost.

Also being built nearby

All of 78215

More parking structures in 78215.

Get alerts for 217 Newell