217 Newell Ave

San Antonio, TX 78215 · Rio Perla Properties LP

Metal stair planned for Pearl South Bridge at 217 Newell

A metal stair is planned for the east side of the Pearl South Bridge at 217 Newell Ave, with flatwork connecting it to the existing bridge landing. The TDLR project registration, filed October 22, 2025, describes a connection between riverwalk level and parking-lot level. The project record lists its status as inspection complete.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 22, 2025

Projects
1
1 filings
Latest filing
Oct 22, 2025
since Oct 22, 2025
Largest scope
2,000 sf
Estimated cost
$500K
state registration

Where this project stands

Inspected · closing out

Pearl South Bridge Metal Stair

2,000 sq ft · $500K est.

  1. RegisteredOct 22, 2025
  2. Plan review
  3. ConstructionNov '25 – Nov '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Constructing a metal stair on the east side of the bridge to get pedestrians from riverwalk level to parking lot level. adding flatwork to connect to existing bridge landing. — pearl south bridge metal stair

    TDLR project registrationNew ConstructionInspection Complete2,000 sq ft$500K est.
    Tenant / owner
    Pearl South Bridge Metal Stair
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 217 Newell Ave

What is being built at 217 Newell Ave?

A metal stair is being added to the east side of the Pearl South Bridge, with flatwork to connect it to the existing bridge landing. The TDLR registration was filed October 22, 2025, under project number TABS2026004022.

What's being built near Rio Perla Properties on Newell Ave?

The project at 217 Newell Ave is a metal stair connecting riverwalk level to parking-lot level at the Pearl South Bridge. Its TDLR registration was filed October 22, 2025.

Is a pedestrian stair being added near Oxbow Development Group?

Yes. The project at 217 Newell Ave describes a metal stair on the east side of the bridge for pedestrians traveling between riverwalk and parking-lot levels.

How will the new stair connect to the Pearl South Bridge?

The project description says flatwork will connect the stair to the existing bridge landing. The TDLR record lists the project as inspection complete.

How much will the Pearl South Bridge stair project cost?

The TDLR registration lists an estimated cost of $500,000. This is the applicant's estimate for the project.

When was the 217 Newell Ave stair project registered?

The TDLR project registration was filed October 22, 2025. The project number is TABS2026004022.

Also being built nearby

All of 78215

More parking structures in 78215.

Email me when the project is closed