9800 Airport Blvd Ta-152
San Antonio, TX 78216 · Properties & Concessions Management Office
Alamo Tequila Bar renovation registered at San Antonio airport
A 557-square-foot renovation for Alamo Tequila Bar is planned in an existing tenant space at San Antonio International Airport, with a bar and grab-and-go food retail. The Texas Department of Licensing and Regulation registered the project on September 22, 2025; the applicant's estimated project cost is $480,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2025
- since Sep 22, 2025
- Largest scope
- 557 sf
- Estimated cost
- $480K
- state registration
Where this project stands
In state plan reviewAlamo Tequila Bar
557 sq ft · $480K est.
- RegisteredSep 22, 2025
- Plan reviewnow
- ConstructionNov '25 – Mar '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectExisting tenant space for new bar with grab and go food retail. existing hvac equipment, ductwork, plumbing fixtures, and electrical panels. all finishes are new. — san antonio international airport
TDLR project registrationRenovation/AlterationProject Registered557 sq ft$480K est.- Project #
- TABS2026001498
- Tenant / owner
- Alamo Tequila Bar
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9800 Airport Blvd Ta-152
What is being built at 9800 Airport Blvd Ta-152?
A 557-square-foot renovation of an existing airport tenant space for Alamo Tequila Bar, with a bar and grab-and-go food retail. The project was registered with TDLR on September 22, 2025.
Is Alamo Tequila Bar opening at San Antonio International Airport?
A TDLR registration describes a new bar with grab-and-go food retail in an existing tenant space. It does not provide an opening date.
When was the Alamo Tequila Bar project registered?
The TDLR project registration, number TABS2026001498, is dated September 22, 2025.
How large is the Alamo Tequila Bar renovation?
The registered project covers 557 square feet in an existing airport tenant space.
How much will the Alamo Tequila Bar project cost?
The applicant's estimated cost for the project is $480,000, according to the TDLR registration.
What's being renovated near the Properties & Concessions Management Office at San Antonio airport?
The Alamo Tequila Bar project is registered at 9800 Airport Blvd Ta-152, near the Properties & Concessions Management Office at Ta-118. It involves a 557-square-foot existing tenant space.
Also being built nearby
All of 78216- 9800 Airport Blvd Ta-118 · Properties & Concessions Management OfficeOct 1, 2025Sat ta-118 pharm table — renovation/alteration — existing wine bar tenant space to new bar with prepackaged to-go food offerings. existing hvac equipment, ductwork, electrical panels, back of house mep and kitchen equipment to remain. relocating bar plumbing fixtures. minor electrical scope
- 9800 Airport Blvd Ta-New · Properties & Concessions Management OfficeSep 22, 2025Alamo tequila bar kiosk — renovation/alteration — new bar kiosk serving prepackaged foods. hvac provided by existing concourse system. fire sprinklers and alarm provided by existing concourse systems. power supplied by existing electrical outlet. plumbing & waste are self contained within new kiosk
- 9800 Airport Blvd. Ta-154 · City Of San Antonio-Aviation PropertyJun 11, 2025Sat univision ta-154 — renovation/alteration — new finish-out of retail space in existing airport shell space
- 9800 Airport Blvd. Terminal B - Ts298 · City Of San Antonio - Aviation Property And Development Manager - ConcessionsOct 30, 2025Istore express — renovation/alteration — demolition and finish out for new retail store in existing airport tenant space
- 9800 Airport Blvd Glf-2 · Properties & Concessions Management OfficeOct 2, 2025Chef johnny's mercado — renovation/alteration — new tenant space for new restaurant. new hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. all interior finishes, including: floor, ceiling treatment and furniture are new
- 9800 Airport Blvd · City Of San AntonioDec 29, 2025Sat terminal c — new construction — new terminal for the san antonio international airport, approximately 912,000 sq ft for all building levels
- 9800 Airport Blvd Ta-129 · Properties & Concessions Management OfficeJul 11, 2025Sat ta-129 freight fried chicken — renovation/alteration — existing quick service space remodel for new restaurant brand. existing hvac equipment, ductwork, electrical panels. all back of house finishes are existing to remain aside from maintenance replacements. all public facing finishes are new
- 9800 Airport Blvd Ta-122 · Properties & Concessions Management OfficeOct 20, 2025Panda express — renovation/alteration — new tenant space for quick serve restaurant. demolition of existing tenant space, floor and ceiling, new hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. all new interior finishes
- 9800 Airport Blvd. Glf01-A1733 · San Antonio Airport AuthorityJun 17, 2025Confluence market glf01-a1733 — renovation/alteration — retail finish-out in existing building shell
- 9800 Airport Blvd. Ts-205/206 · San Antonio Airport AuthorityJun 25, 2025Military city usa — renovation/alteration — new tenant finish-out in existing airport space
- 9800 Airport Blvd Tb-Ts204 · Properties & Concessions Management OfficeJul 31, 2025Southerleigh — renovation/alteration — renovation of an existing restaurant tenant space to accommodate a new restaurant. work includes: modifications to existing hvac, plumbing, electrical; install kitchen equipment, and finish changes
- 9800 Airport Blvd Ta-124 · Properties & Concessions Management OfficeMay 30, 2025Sat ta-124 tre pizzeria — renovation/alteration — existing quick service space remodel for new restaurant brand. existing hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. new back of house ceiling grid and tiles other back of house finishes are existing to