4500 Industry Park Dr
San Antonio, TX 78218 · Labatt Institutional Supply
Labatt plans a 60-foot high-rise freezer in San Antonio
A 32,500-square-foot freezer addition is planned on the west side of Labatt Institutional Supply at 4500 Industry Park Dr. The TDLR project registration was filed July 17, 2024, and describes a 60-foot rack-supported structure with a refrigeration equipment penthouse. The applicant’s estimated project cost is $13,454,900.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 17, 2024
- since Jul 17, 2024
- Largest scope
- 32,500 sf
- Estimated cost
- $13M
- state registration
Where this project stands
Finishing up · inspection nextLabatt San Antonio High Rise Freezer
32,500 sq ft · $13M est.
- RegisteredJul 17, 2024
- Plan review
- ConstructionSep '24 – Dec '25
- Inspectednow
- Closed
Scheduled to finish Dec 15, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAdding new freezer on west side of facility. the rack supported structure will be 60 ft tall and have a refrigeration equipment penthouse. — labatt food service
TDLR project registrationAdditions to Existing BuildingReview Complete32,500 sq ft$13M est.- Project #
- TABS2024023268
- Tenant / owner
- Labatt San Antonio High Rise Freezer
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4500 Industry Park Dr
What is being built at 4500 Industry Park Dr in San Antonio?
A 32,500-square-foot high-rise freezer addition is planned for Labatt Institutional Supply. The project description calls for a 60-foot rack-supported structure and a refrigeration equipment penthouse.
When was the Labatt freezer project filed?
The TDLR registration was filed July 17, 2024. It is listed as Review Complete under project number TABS2024023268.
How tall will the new freezer structure be?
The project description says the rack-supported structure will be 60 feet tall. It also includes a refrigeration equipment penthouse.
How much will the Labatt freezer project cost?
The applicant’s estimated cost for the project is $13,454,900. This is an estimate, not a confirmed final cost.
What is being built near H-E-B on Industry Park Drive?
Labatt Institutional Supply has a registered project for a 32,500-square-foot high-rise freezer addition at 4500 Industry Park Dr. The project description places it on the west side of the facility.
Is the project a new building or an addition?
The TDLR registration classifies it as an addition to an existing building. The description says the freezer will be added on the west side of the existing facility.
Also being built nearby
All of 78218- 4300 Industry Park Drive · He Butt Grocery Co.Jan 8, 2024#23166 - heb seasonal warehouse second floor remodel — renovation/alteration — interior remodel and restroom. cad #554610
- 4300 Industry Park Drive · H-E-B, LPApr 24, 2026Heb sa scpo/seasonal renovation — renovation/alteration — interior renovation of approx. 17,000 sq ft of existing office/admin and lobby spaces. project also includes exterior re-striping of existing surface parking lot and selective demolition/replacement of existing exterior stairs, sidewalk, and ada ramps
- 4500 Industry Park Drive · Labatt Institutional SupplyOct 13, 2025Labatt co-generation project — additions to existing building — 444.2
- 5430 Greatfare Drive · Heb Grocery Company LPDec 11, 2025Public affairs office remodel / warehouse modifications at seasonal ii — renovation/alteration — 4,292 s.f. interior finish-out located within a existing shell building · 53 m away
- 4710 Industry Park Drive · H.e. Butt Grocery CompanyMar 25, 2024#24019 - heb sa packaging plant amenities updgrade — renovation/alteration — interior remodel and restroom. cad #554610 · 420 m away
- 4710 N Interstate 35 · Butt H E Grocery CoSep 8, 2026Sai spiral freezer renovation — renovation/alteration — renovation of a 772sf area for a spiral freezer inside the ice cream plant, construction of a 132sf lean-to addition to house a relocated clean in place (cip) utility skid · 594 m away
- 4710 N IH 35 · HebApr 18, 2024Heb receiving bay — additions to existing building — addition of utility piping to feed new cip units for heb receiving bays. this includes a structural addition to the existing pipe rack · 594 m away