4710 Industry Park Drive
San Antonio, TX 78218 · H.e. Butt Grocery Company
H-E-B packaging plant amenities remodel registered in 2024
A 415-square-foot interior remodel and restroom update was registered for the H-E-B packaging plant at 4710 Industry Park Drive. The Texas Department of Licensing and Regulation record was filed March 25, 2024, and lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 25, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 25, 2024
- since Mar 25, 2024
- Largest scope
- 415 sf
- Estimated cost
- $126K
- state registration
Where this project stands
Completed#24019 - HEB SA Packaging Plant Amenities Updgrade
415 sq ft · $126K est.
- RegisteredMar 25, 2024
- Plan review
- ConstructionApr '24 – Jul '25
- Inspected
- Closed
Ran as a 16-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior remodel and restroom. cad #554610 — heb sa packaging plant
TDLR project registrationRenovation/AlterationProject Closed415 sq ft$126K est.- Project #
- TABS2024014578
- Tenant / owner
- #24019 - Heb Sa Packaging Plant Amenities Updgrade
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4710 Industry Park Drive
What is being built at 4710 Industry Park Drive?
A Texas Department of Licensing and Regulation registration describes a 415-square-foot interior remodel and restroom update at the H-E-B packaging plant. The record lists the project as closed.
When was the H-E-B packaging plant remodel registered?
The TDLR project registration was filed March 25, 2024.
What is the project number for the work at 4710 Industry Park Drive?
The TDLR registration number is TABS2024014578. The project is named “#24019 - HEB SA Packaging Plant Amenities Updgrade.”
How large is the H-E-B packaging plant remodel?
The registration lists the remodel area as 415 square feet.
How much is the H-E-B packaging plant remodel estimated to cost?
The applicant's TDLR estimate is $126,100. This is an estimate for the project, not a reported final cost.
What is being remodeled near H-E-B at 4300 Industry Park Drive?
A 415-square-foot interior remodel and restroom update was registered for the H-E-B packaging plant at 4710 Industry Park Drive, about 420 meters from H-E-B at 4300 Industry Park Drive. The registration was filed March 25, 2024.
Also being built nearby
All of 78218- 4710 N Interstate 35 · Butt H E Grocery CoSep 8, 2026Sai spiral freezer renovation — renovation/alteration — renovation of a 772sf area for a spiral freezer inside the ice cream plant, construction of a 132sf lean-to addition to house a relocated clean in place (cip) utility skid · 210 m away
- 4710 N IH 35 · HebApr 18, 2024Heb receiving bay — additions to existing building — addition of utility piping to feed new cip units for heb receiving bays. this includes a structural addition to the existing pipe rack · 210 m away
- 4300 Industry Park Drive · H-E-B, LPApr 24, 2026Heb sa scpo/seasonal renovation — renovation/alteration — interior renovation of approx. 17,000 sq ft of existing office/admin and lobby spaces. project also includes exterior re-striping of existing surface parking lot and selective demolition/replacement of existing exterior stairs, sidewalk, and ada ramps · 420 m away
- 4500 Industry Park Drive · Labatt Institutional SupplyOct 13, 2025Labatt co-generation project — additions to existing building — 444.2 · 420 m away
- 4500 Industry Park Dr · Labatt Institutional SupplyJul 17, 2024Labatt san antonio high rise freezer — additions to existing building — adding new freezer on west side of facility. the rack supported structure will be 60 ft tall and have a refrigeration equipment penthouse · 420 m away
- 4300 Industry Park Drive · He Butt Grocery Co.Jan 8, 2024#23166 - heb seasonal warehouse second floor remodel — renovation/alteration — interior remodel and restroom. cad #554610 · 420 m away
- 5430 Greatfare Drive · Heb Grocery Company LPDec 11, 2025Public affairs office remodel / warehouse modifications at seasonal ii — renovation/alteration — 4,292 s.f. interior finish-out located within a existing shell building · 436 m away
- 4967 Space Center Dr · HebJan 3, 2024Heb new steam plant — new construction — new 8,000 sq ft cmu boiler plant building which will contain 3-800 hp steam boilers · 458 m away