6806 Cal Turner Dr
San Antonio, TX 78220 · Amazon Fulfillment Center Sat3 - Qtx3 Ground Paddc, Dock Door Retrofit 2024 Sat3
Modular delivery-system structures planned at 6806 Cal Turner Dr
A 9,400-square-foot project in the existing SAT3 site’s parking lot includes fencing around two modular structures and marked circulation and launch and landing areas for a delivery system. The TDLR project registration was filed June 18, 2025, and lists an estimated project cost of $890,000. The multi-tenant site also had a dock-door retrofit registered in September 2024.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 18, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 18, 2025
- since Sep 17, 2024
- Largest scope
- 9,400 sf
- Estimated cost
- $890K
- state registration
Where this project stands
CompletedAmazon Fulfillment Center SAT3 - QTX3 Ground PADDC
9,400 sq ft · $890K est.
- RegisteredJun 18, 2025
- Plan review
- ConstructionJul '25 – Oct '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsNew construction (located in parking lot of existing sat3 site). perimeter fencing around 2 modular structures. striping on existing pavement within fenced area for accessible circulation and launch / landing pads for delivery system — amazon fulfillment center sat3
TDLR project registrationNew ConstructionProject Closed9,400 sq ft$890K est.- Project #
- TABS2025021562
- Tenant / owner
- Amazon Fulfillment Center Sat3 - Qtx3 Ground Paddc
- Design firm
- Pro
- Contact
- Pro
The removal of existing drive-in ramp, concrete stair and drive-in overhead door. infilling of the existing overhead door opening to fit a new dock door. the affected area is about 1,403 sq ft — amazon warehouse
TDLR project registrationRenovation/AlterationProject Closed1,400 sq ft$250K est.- Project #
- TABS2025001111
- Tenant / owner
- Dock Door Retrofit 2024 Sat3
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6806 Cal Turner Dr
What is being built at 6806 Cal Turner Dr?
A TDLR registration describes two modular structures in the parking lot of the existing SAT3 site, with fencing and marked areas for circulation and delivery-system launch and landing. The 9,400-square-foot project was registered June 18, 2025, as TABS2025021562.
What is the new construction at the Amazon SAT3 site in San Antonio?
The registration for Amazon Fulfillment Center SAT3 describes two modular structures and marked launch and landing areas for a delivery system. It was filed June 18, 2025, as TABS2025021562; the address is a multi-tenant site.
When was the project at 6806 Cal Turner Dr permitted?
The TDLR registration for the 9,400-square-foot parking-lot project was filed June 18, 2025. Its registration number is TABS2025021562.
How much will the 6806 Cal Turner Dr project cost?
The applicant’s estimated cost for the 9,400-square-foot project is $890,000, according to TDLR registration TABS2025021562. This is an estimate, not a reported final cost.
What's being built near Connection Park Logistics Center?
A TDLR registration describes two modular structures and delivery-system launch and landing areas at 6806 Cal Turner Dr, about 402 meters from Connection Park Logistics Center. The project was registered June 18, 2025.
Was there also a dock-door project at 6806 Cal Turner Dr?
Yes. A TDLR registration filed September 17, 2024, describes removing an existing drive-in ramp, stair and overhead door, then filling the opening to fit a new dock door. The affected area was about 1,403 square feet; the registration is TABS2025001111.
Also being built nearby
All of 78220- 6806 Cal Turner Drive Pittsburgh Pa 15241 · Usre Star LLC Dba Amazon Fullfillment Center Sat3Mar 3, 2025Amazon sat3 - obd-a upgrades — renovation/alteration — update 17 manual workstations with robot arm workstations and add associated charging and maintenance area along with compressed air and vacuum piping loops, remediate floor finish where required
- 6851 Cal Turner Drive · Connection Park Logistics CenterOct 20, 2026Penske — renovation/alteration — interior finish out and fence/site work · 402 m away
- 190 N Foster Road · Dollar GeneralOct 17, 2024Dollar general store #31291 — new construction — new construction of 10,640sf dollar general store, pre-manufactured metal building · 444 m away