6806 Cal Turner Drive Pittsburgh Pa 15241
San Antonio, TX 78220 · Usre Star LLC Dba Amazon Fullfillment Center Sat3
Amazon SAT3 plans robot workstation upgrades in San Antonio
A renovation at the Amazon SAT3 fulfillment center in San Antonio will replace 17 manual workstations with robot-arm workstations and add related charging, maintenance, compressed-air and vacuum systems. The project was registered with TDLR on March 3, 2025, under project number TABS2025013215.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 3, 2025
- since Mar 3, 2025
- Largest scope
- 150,000 sf
- Estimated cost
- $2.0M
- state registration
Where this project stands
Finishing up · inspection nextAmazon SAT3 - OBD-A Upgrades
150,000 sq ft · $2.0M est.
- RegisteredMar 3, 2025
- Plan review
- ConstructionMay '25 – Jul '25
- Inspectednow
- Closed
Scheduled to finish Jul 1, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectUpdate 17 manual workstations with robot arm workstations and add associated charging and maintenance area along with compressed air and vacuum piping loops, remediate floor finish where required. — amazon fulfillment center sat3
TDLR project registrationRenovation/AlterationReview Complete150,000 sq ft$2.0M est.- Project #
- TABS2025013215
- Tenant / owner
- Amazon Sat3 - Obd-A Upgrades
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6806 Cal Turner Drive Pittsburgh Pa 15241
What is being built at 6806 Cal Turner Drive?
A registered renovation project at the Amazon SAT3 fulfillment center covers upgrades to 17 manual workstations, replacing them with robot-arm workstations and adding related support areas and systems.
What work is planned at the Amazon SAT3 fulfillment center?
The TDLR registration describes robot-arm workstations, a charging and maintenance area, compressed-air and vacuum piping loops, and floor-finish repairs where needed.
When was the Amazon SAT3 project registered?
The project was registered with TDLR on March 3, 2025. Its project number is TABS2025013215.
How much is the Amazon SAT3 renovation expected to cost?
The TDLR registration lists an estimated project cost of $2 million.
Is this a new fulfillment center in San Antonio?
The TDLR record describes a renovation and workstation upgrade at Amazon SAT3, not construction of a new fulfillment center.
What's being upgraded near Connection Park Logistics Center?
The Amazon SAT3 renovation is listed at 6806 Cal Turner Drive, about 402 meters from Connection Park Logistics Center. The registered work includes robot-arm workstation upgrades.
Also being built nearby
All of 78220- 6806 Cal Turner Dr · Usre Star LLCJun 18, 2025Amazon fulfillment center sat3 - qtx3 ground paddc — new construction — new construction (located in parking lot of existing sat3 site). perimeter fencing around 2 modular structures. striping on existing pavement within fenced area for accessible circulation and launch / landing pads for delivery system
- 6851 Cal Turner Drive · Connection Park Logistics CenterOct 20, 2026Penske — renovation/alteration — interior finish out and fence/site work · 402 m away
- 190 N Foster Road · Dollar GeneralOct 17, 2024Dollar general store #31291 — new construction — new construction of 10,640sf dollar general store, pre-manufactured metal building · 444 m away