300 S. Callaghan
San Antonio, TX 78227 · The City Of San Antonio
Emergency services warehouse planned at 300 S. Callaghan
A 9,000-square-foot emergency services warehouse is planned at 300 S. Callaghan in San Antonio. The new-construction project was registered with the Texas Department of Licensing and Regulation on May 22, 2026; the registration describes a pre-engineered metal building, exterior paving, fence modifications, and drainage upgrades.
Summarized from Texas Department of Licensing and Regulation records · updated May 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 22, 2026
- since May 22, 2026
- Largest scope
- 9,000 sf
- Estimated cost
- $5.4M
- state registration
Where this project stands
In state plan reviewCOSA Emergency Services Warehouse
9,000 sq ft · $5.4M est.
- RegisteredMay 22, 2026
- Plan reviewnow
- ConstructionSep '26 – Sep '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project9,000 sq ft pre-engineered metal building on a slab-on-grade foundation, exterior concrete paving, modified existing fence and paving and drainage upgrades. — emergency services warehouse
TDLR project registrationNew ConstructionProject Registered9,000 sq ft$5.4M est.- Project #
- TABS2026021038
- Tenant / owner
- Cosa Emergency Services Warehouse
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 300 S. Callaghan
What is being built at 300 S. Callaghan?
A 9,000-square-foot emergency services warehouse is planned for the site. The TDLR registration describes a pre-engineered metal building on a slab-on-grade foundation.
When was the 300 S. Callaghan warehouse project registered?
The project was registered with the Texas Department of Licensing and Regulation on May 22, 2026. The registration number is TABS2026021038.
Is there a building permit for the warehouse at 300 S. Callaghan?
The available record is a TDLR project registration dated May 22, 2026, not a city building permit record.
How large will the emergency services warehouse be?
The project registration lists 9,000 square feet of new construction.
What is the estimated cost of the 300 S. Callaghan project?
The applicant's TDLR estimate is $5.4 million for the project.
What's being built near Westport Industrial Park on S. Callaghan?
A 9,000-square-foot emergency services warehouse is planned at 300 S. Callaghan, about 134 meters from Westport Industrial Park at 438 S. Callaghan Road. Its TDLR registration was filed May 22, 2026.
Also being built nearby
All of 78227- 438 S Callaghan Rd · Tga Westport Ip LLCJun 24, 2026Westport industrial park — renovation/alteration — interior office buildout (2,110sf) in an existing building · 134 m away
- 438 S Callaghan · Callaghan 151 LPMar 20, 2026Westport - primo water interior finish out — renovation/alteration — interior finish out in an existing warehouse building. approx. 4000 sq ft or office space with the remaining space to be storage · 134 m away
- 6927 W Commerce St · City Of San AntonioMar 26, 2024Southwest service center — additions to existing building — 660.30kw dc solar system divided among 3 canopies · 303 m away