7111 Huebner Road
San Antonio, TX 78240 · Northside Independent School District
Leon Valley Elementary HVAC upgrades registered in San Antonio
Mechanical upgrades to the HVAC system at Leon Valley Elementary School at 7111 Huebner Road were registered with TDLR on March 26, 2024. The work covers the 66,000-square-foot school and includes replacing air-handling units, chillers, boilers, pumps and ductwork, along with control and zoning upgrades.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 26, 2024
- since Mar 26, 2024
- Largest scope
- 66,000 sf
- Estimated cost
- $5.8M
- state registration
Where this project stands
Inspected · closing outMechanical Upgrades at Leon Valley ES
66,000 sq ft · $5.8M est.
- RegisteredMar 26, 2024
- Plan review
- ConstructionJun '24 – Aug '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplace 6 ahu's, 2 chillers, 2 boilers, and chilled and hot water pumps. replace existing ductwork with fan powered vav's. upgrade controls and re-zone building hvac. 66,000 sq ft — leon valley elementary school
TDLR project registrationRenovation/AlterationInspection Complete66,000 sq ft$5.8M est.- Project #
- TABS2024014683
- Tenant / owner
- Mechanical Upgrades At Leon Valley Es
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7111 Huebner Road
What is being built at 7111 Huebner Road in San Antonio?
The project is a renovation of Leon Valley Elementary School’s HVAC system, not a new building. Its TDLR registration, TABS2024014683, was filed March 26, 2024.
What HVAC work is planned at Leon Valley Elementary?
The registered scope includes replacing six air-handling units, two chillers, two boilers, chilled- and hot-water pumps, and existing ductwork. It also calls for control upgrades and HVAC rezoning.
When was the Leon Valley Elementary mechanical project registered?
The TDLR project registration was filed March 26, 2024. The record lists its status as Inspection Complete.
How much will the Leon Valley Elementary HVAC upgrades cost?
The applicant’s TDLR estimate for the project is $5.75 million. This is an estimate, not a confirmed final cost.
How large is the Leon Valley Elementary project near Northside ISD?
The HVAC renovation covers a 66,000-square-foot school at the same address as the Northside ISD landmark listing: 7111 Huebner Road.
Also being built nearby
All of 78240- 7111 Huebner Rd · Northside ISDApr 1, 2026Leon valley elementary school — new construction — ground level play area
- 7111 Huebner Rd, San Antonio, TX 78240 · Northside ISDJan 19, 2026Flooring replacement at leon valley es — renovation/alteration — replacing all vct flooring in classrooms and corridors, new tile and partitions in both sets of boys and girls restrooms. 39,495 sq ft
- 7068b Bandera Road · Leors Holdings, LLCJul 29, 2025Bandera center beauty shop — renovation/alteration — complete renovation of the tenant space for the beauty shop, including, but not limited to, new flooring, new interior partitions, new ceilings, new ductwork, new electrical panel and painting of walls · 287 m away
- 7090 Bandera Rd · Bandera HeightsMar 3, 2025Teriyaki master — renovation/alteration — interior finish out restaurant · 356 m away
- 6812 Sawyer Road · Ayala Land Holding, LLCJan 8, 2026Warehouse renovation — renovation/alteration — renovation of 3500sq.ft warehouse with two offices and two bathrooms as per engineer plans · 445 m away
- 6808 Huebner Rd · Leon Sa Income Partners, LPJun 19, 2026Hyper-kidz — renovation/alteration — detailed scope of work-interior buildout per plans · 482 m away
- 6802 Bandera Rd · Harmony Brothers LLCFeb 12, 2026Little caesars fo — new construction — first generation interior finish-out for take-out food service establishment · 544 m away
- 6800 Evers Road · St. John Baptist Church Of San AntonioApr 1, 2025#22257 - st. john baptist church new building — new construction — single-story pre-engineered building. with worship space, cry room, welcome room, restrooms and admin. office. cad #1058445 · 570 m away