7111 Huebner Rd, San Antonio, TX 78240
San Antonio, TX 78240 · Northside ISD
Leon Valley Elementary flooring and restroom renovation
A renovation at Leon Valley Elementary will replace VCT flooring in classrooms and corridors and add tile and partitions in both boys’ and girls’ restrooms. The project was registered with TDLR on January 19, 2026, and its status is listed as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 19, 2026
- since Jan 19, 2026
- Largest scope
- 39,495 sf
- Estimated cost
- $830K
- state registration
Where this project stands
Inspected · closing outFlooring Replacement at Leon Valley ES
39,495 sq ft · $830K est.
- RegisteredJan 19, 2026
- Plan review
- ConstructionSep '25 – Jul '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplacing all vct flooring in classrooms and corridors, new tile and partitions in both sets of boys and girls restrooms. 39,495 sq ft — leon valley elementary school
TDLR project registrationRenovation/AlterationInspection Complete39,495 sq ft$830K est.- Project #
- TABS2026010364
- Tenant / owner
- Flooring Replacement At Leon Valley Es
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7111 Huebner Rd, San Antonio, TX 78240
What is being renovated at 7111 Huebner Road?
The work at Leon Valley Elementary includes replacing classroom and corridor flooring and adding tile and partitions in both sets of restrooms. The TDLR registration covers 39,495 square feet.
When was the Leon Valley Elementary renovation permitted?
The project was registered with TDLR on January 19, 2026, under project number TABS2026010364.
How much is the Leon Valley Elementary renovation estimated to cost?
The TDLR registration lists an estimated project cost of $830,000.
Is the work at Leon Valley Elementary complete?
The TDLR record lists the project status as inspection complete.
What work is happening near Hyper-Kidz on Huebner Road?
At Leon Valley Elementary, about 482 meters from Hyper-Kidz, the registered work covers flooring and restroom renovations. TDLR lists the registration date as January 19, 2026.
Is a new school being built at 7111 Huebner Road?
The TDLR record describes a renovation at Leon Valley Elementary, not new school construction. The listed work is flooring replacement and restroom improvements.
Also being built nearby
All of 78240- 7111 Huebner Rd · Northside ISDApr 1, 2026Leon valley elementary school — new construction — ground level play area
- 7111 Huebner Road · Northside Independent School DistrictMar 26, 2024Mechanical upgrades at leon valley es — renovation/alteration — replace 6 ahu's, 2 chillers, 2 boilers, and chilled and hot water pumps. replace existing ductwork with fan powered vav's. upgrade controls and re-zone building hvac. 66,000 sq ft
- 7068b Bandera Road · Leors Holdings, LLCJul 29, 2025Bandera center beauty shop — renovation/alteration — complete renovation of the tenant space for the beauty shop, including, but not limited to, new flooring, new interior partitions, new ceilings, new ductwork, new electrical panel and painting of walls · 287 m away
- 7090 Bandera Rd · Bandera HeightsMar 3, 2025Teriyaki master — renovation/alteration — interior finish out restaurant · 356 m away
- 6812 Sawyer Road · Ayala Land Holding, LLCJan 8, 2026Warehouse renovation — renovation/alteration — renovation of 3500sq.ft warehouse with two offices and two bathrooms as per engineer plans · 445 m away
- 6808 Huebner Rd · Leon Sa Income Partners, LPJun 19, 2026Hyper-kidz — renovation/alteration — detailed scope of work-interior buildout per plans · 482 m away
- 6802 Bandera Rd · Harmony Brothers LLCFeb 12, 2026Little caesars fo — new construction — first generation interior finish-out for take-out food service establishment · 544 m away
- 6800 Evers Road · St. John Baptist Church Of San AntonioApr 1, 2025#22257 - st. john baptist church new building — new construction — single-story pre-engineered building. with worship space, cry room, welcome room, restrooms and admin. office. cad #1058445 · 570 m away