520 Madison Oaks Dr
San Antonio, TX 78258 · Vhs San Antonio Partners LLC
North Central Baptist plans hybrid operating room renovation
A renovation at 520 Madison Oaks Dr will create a hybrid operating room at North Central Baptist Hospital. The project was registered with the Texas Department of Licensing and Regulation on January 24, 2024, and covers 8,950 square feet. The applicant estimated the project cost at $5 million; its status is listed as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 24, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 24, 2024
- since Jan 24, 2024
- Largest scope
- 8,950 sf
- Estimated cost
- $5.0M
- state registration
Where this project stands
Inspected · closing outNorth Central Baptist Hybrid OR
8,950 sq ft · $5.0M est.
- RegisteredJan 24, 2024
- Plan review
- ConstructionApr '24 – Oct '24
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectDemolishing current holding area to create a hybrid or room. ancillary spaces are being demolished and relocated as required by the hospital or codes. new walls, equipment, flooring, ceilings, air handling unit will be installed and constructed. — north central baptist hospital
TDLR project registrationRenovation/AlterationInspection Complete8,950 sq ft$5.0M est.- Project #
- TABS2024009976
- Tenant / owner
- North Central Baptist Hybrid Or
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 520 Madison Oaks Dr
What is being built at 520 Madison Oaks Dr in San Antonio?
The project is a renovation to create a hybrid operating room at North Central Baptist Hospital. The work includes new walls, equipment, flooring, ceilings, and an air-handling unit.
When was the North Central Baptist hybrid OR project filed?
The TDLR project registration was filed January 24, 2024. Its project number is TABS2024009976.
How large is the North Central Baptist hybrid operating room renovation?
The registered project covers 8,950 square feet.
How much is the hybrid OR project estimated to cost?
The applicant's TDLR registration lists an estimated project cost of $5 million.
Is the North Central Baptist project near Stone Oak Medical Building?
Yes. Stone Oak Medical Building at 540 Madison Oak Drive is listed about 81 meters from the project address.
What is happening next to North Central Baptist Hospital on Madison Oak?
The project at the hospital is a renovation to create a hybrid operating room. The TDLR registration lists its status as inspection complete.
Also being built nearby
All of 78258- 520 Madison Oak Dr · North Central Baptist HospitalAug 8, 2024Cath lab 2 equipment replacement — renovation/alteration — demolition and replacement of medical equipment, flooring, millwork, lighting, scrub sink, door, and pedestal. adding new gas outlets and electrical isopanel. ceiling repair as needed with new lighting and equipment
- 520 Madison Oak Dr · Vhs San Antonio Partners LLCAug 5, 2026North central baptist - ct equipment replacement — renovation/alteration — renovation and removal of existing ct scan equipment and installation of new ct scan equipment. new flooring, ceiling tiles, paint, removal of millwork, new wall hung sink & addition of lead lined door to corridor
- 520 Madison Oak Drive · Vhs San Antonio Partners LLCMay 12, 2026Aru expansion — new construction — shell finish out to existing 6th floor of hospital to create expansion to existing aru department
- 502 Madison Oak · Hcp San Antonio TX Mob, LLCOct 15, 2025Heart clinic of san antonio expansion — renovation/alteration — expansion of existing clinic into adjacent vacant suite. demolition, new walls, finishes, plumbing, electrical, and mechanical · 69 m away
- 502 Madison Oak Drive · Hcp San Antonio TX Mob, LLCOct 15, 2025Atrium mob suite 350 — renovation/alteration — interior renovation · 69 m away
- 540 Madison Oak Drive · Stone Oak Medical BuildingMay 13, 2024Stone oak medical building, suite 600 — renovation/alteration — interior renovation in existing suite · 81 m away
- 540 Madison Oak · Stone Oak MobAug 10, 2026Suite 615 spec suite — renovation/alteration — interior renovation · 81 m away
- 19054 Stone Oak Pkwy · Bleu Grey Holdings LLCJan 21, 2025Airrosti stone oak — renovation/alteration — full interior remodel · 332 m away
- 525 Oak Centre Dr · Remington OaksJul 21, 2026Baptist health systems suite 300 — renovation/alteration — interior finish out · 342 m away
- 525 Oak Centre Drive · Remington OaksJan 27, 2026Remington oaks-suite 160 — renovation/alteration — interior renovation · 342 m away
- 19016 Stone Oak Parkway 120 · Stone Oak Physicians Plaza I And Plaza IIFeb 12, 2025Tenant improvement project stone oak — renovation/alteration — finish out of a 1654 medical office · 434 m away
- 19016 Stone Oak Parkway · 19016 Stone Oak Pkwy LLCJan 30, 2024Welltower stone oak san antonio — renovation/alteration — finish upgrade of 2498sf medical office · 434 m away