525 Oak Centre Dr
San Antonio, TX 78258 · Remington Oaks
Baptist Health Systems Suite 300 finish-out in San Antonio
A 5,210-square-foot interior finish-out for Baptist Health Systems Suite 300 is registered at 525 Oak Centre Dr in San Antonio. The Texas Department of Licensing and Regulation record was filed July 21, 2026, and lists the project status as Inspection Complete. The applicant’s estimated project cost is $585,364.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 21, 2026
- since Jul 21, 2026
- Largest scope
- 5,210 sf
- Estimated cost
- $585K
- state registration
Where this project stands
Inspected · closing outBaptist Health Systems Suite 300
5,210 sq ft · $585K est.
- RegisteredJul 21, 2026
- Plan review
- ConstructionJul '26 – Sep '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior finish out — remington oaks
TDLR project registrationRenovation/AlterationInspection Complete5,210 sq ft$585K est.- Project #
- TABS2026025758
- Tenant / owner
- Baptist Health Systems Suite 300
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 525 Oak Centre Dr
What is being built at 525 Oak Centre Dr?
A 5,210-square-foot interior finish-out for Baptist Health Systems Suite 300 is registered at the address. TDLR project registration TABS2026025758 was filed July 21, 2026.
What is the project at 525 Oak Centre Dr in San Antonio?
The project is an interior finish-out listed as Baptist Health Systems Suite 300. Its TDLR record lists the status as Inspection Complete.
When was the Baptist Health Systems Suite 300 project permitted?
The TDLR registration was filed July 21, 2026. The record identifies the project as a renovation or alteration.
How large is the finish-out at 525 Oak Centre Dr?
The registered project covers 5,210 square feet. The applicant’s estimated cost is $585,364.
What is being built near Remington Oaks-Suite 160?
A 5,210-square-foot interior finish-out for Baptist Health Systems Suite 300 is registered at 525 Oak Centre Dr, the same address listed for Remington Oaks-Suite 160. The TDLR filing date is July 21, 2026.
Is the 525 Oak Centre Dr project complete?
The TDLR record for project TABS2026025758 lists its status as Inspection Complete. The registration was filed July 21, 2026.
Also being built nearby
All of 78258- 525 Oak Centre Drive · Remington OaksJan 27, 2026Remington oaks-suite 160 — renovation/alteration — interior renovation
- 19016 Stone Oak Parkway · 19016 Stone Oak Pkwy LLCJan 30, 2024Welltower stone oak san antonio — renovation/alteration — finish upgrade of 2498sf medical office · 92 m away
- 19016 Stone Oak Parkway 120 · Stone Oak Physicians Plaza I And Plaza IIFeb 12, 2025Tenant improvement project stone oak — renovation/alteration — finish out of a 1654 medical office · 92 m away
- 540 Madison Oak Drive · Stone Oak Medical BuildingMay 13, 2024Stone oak medical building, suite 600 — renovation/alteration — interior renovation in existing suite · 282 m away
- 540 Madison Oak · Stone Oak MobAug 10, 2026Suite 615 spec suite — renovation/alteration — interior renovation · 282 m away
- 150 E Sonterra · Welltower INCJan 10, 2025Amelia aesthetics — renovation/alteration — expansion to existing clinic; new walls, doors, mep, finishes for procedure rooms · 314 m away
- 150 East Sonterra Blvd · San Antonio 150 Mp Wrk7 LLCMay 19, 2026Specialty infusion — renovation/alteration — interior renovation / remodel · 314 m away
- 150 E Sonterra Blvd · Welltower Inc.Feb 5, 2024Releviimed spine & pain — renovation/alteration — removing and replacing a back door along with adding more exam rooms within the new space · 314 m away
- 225 East Sonterra Blvd · Healthcare RealtyMay 27, 2025Maxim healthcare services — renovation/alteration — remodel to retrofit existing medical office to accommodate the needs of maxim healthcare services · 336 m away
- 520 Madison Oaks Dr · Vhs San Antonio Partners LLCJan 24, 2024North central baptist hybrid or — renovation/alteration — demolishing current holding area to create a hybrid or room. ancillary spaces are being demolished and relocated as required by the hospital or codes. new walls, equipment, flooring, ceilings, air handling unit will be installed and constructed · 342 m away
- 520 Madison Oak Drive · Vhs San Antonio Partners LLCMay 12, 2026Aru expansion — new construction — shell finish out to existing 6th floor of hospital to create expansion to existing aru department · 342 m away
- 520 Madison Oak Dr · Vhs San Antonio Partners LLCAug 5, 2026North central baptist - ct equipment replacement — renovation/alteration — renovation and removal of existing ct scan equipment and installation of new ct scan equipment. new flooring, ceiling tiles, paint, removal of millwork, new wall hung sink & addition of lead lined door to corridor · 342 m away