2022 N. US Highway 75 Sherman, TX 75090
Sherman, TX 77386 · Medistar Sherman Micro Hospital LLC
Nutex Sherman hospital renovation registered
A renovation of an approximately 18,500-square-foot, one-story hospital is registered for 2022 N. US Highway 75 in Sherman. The TDLR project registration was filed November 5, 2025, and describes imaging equipment replacement, new paint and flooring, millwork and door repairs or replacement, and wall protection; the applicant's estimated project cost is $50,000.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2025
- since Nov 5, 2025
- Largest scope
- 18,500 sf
- Estimated cost
- $50K
- state registration
Where this project stands
CompletedNutex Sherman
18,500 sq ft · $50K est.
- RegisteredNov 5, 2025
- Plan review
- ConstructionSep '25 – Oct '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRenovation of a 1 story hospital of approximately 18,500 sq ft the scope of work includes the exchange of imaging equipment, new paint and flooring, repair/replacement of existing millwork and identified doors, and the installation of wall protection — red river er and hospital
TDLR project registrationRenovation/AlterationProject Closed18,500 sq ft$50K est.- Project #
- TABS2026005082
- Tenant / owner
- Nutex Sherman
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2022 N. US Highway 75 Sherman, TX 75090
What is being built at 2022 N. US Highway 75 in Sherman?
The TDLR registration describes a renovation of an existing, one-story hospital of approximately 18,500 square feet. The work includes exchanging imaging equipment and interior repairs and updates.
Is Nutex Sherman opening a new hospital in Sherman?
The registration describes renovation work at a hospital, not construction of a new hospital. It was filed November 5, 2025.
What work is planned at the Nutex Sherman hospital?
The listed scope includes exchanging imaging equipment, new paint and flooring, repair or replacement of existing millwork and identified doors, and installation of wall protection.
When was the Nutex Sherman renovation registered?
The TDLR project registration, TABS2026005082, was filed November 5, 2025. Its listed status is Project Closed.
How much will the Nutex Sherman hospital renovation cost?
The applicant's estimated cost for the project is $50,000, according to the TDLR registration.
How large is the Nutex Sherman hospital renovation?
The project registration describes renovation work at an approximately 18,500-square-foot, one-story hospital.