17500 W Grand Pkwy S Lynbrook Hollow
Sugar Land, TX 77042 · Memorial Hermann Hospital- Property Tax Dept
Memorial Hermann Sugar Land relocates anesthesia area
A 1,500-square-foot renovation will relocate an existing anesthesia workroom, office and sleep room in Memorial Hermann Sugar Land Hospital’s second-floor surgical suite. The project was registered with TDLR on September 26, 2024, and is listed as closed. The applicant’s estimated project cost is $70,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 26, 2024
- since Sep 26, 2024
- Largest scope
- 1,500 sf
- Estimated cost
- $70K
- state registration
Where this project stands
CompletedMemorial Hermann Sugar Land Anesthesia Area relocation
1,500 sq ft · $70K est.
- RegisteredSep 26, 2024
- Plan review
- ConstructionJan '25 – Mar '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project scope includes the relocation of the existing anesthesia workroom, office and sleep room located in the surgical sutie on the second floor of the memorial hermann healthcare system. — memorial hermann sugar land hospital
TDLR project registrationRenovation/AlterationProject Closed1,500 sq ft$70K est.- Project #
- TABS2025001925
- Tenant / owner
- Memorial Hermann Sugar Land Anesthesia Area Relocation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 17500 W Grand Pkwy S Lynbrook Hollow
What is being built at 17500 W Grand Pkwy S?
The project relocates an existing anesthesia workroom, office and sleep room in Memorial Hermann Sugar Land Hospital’s second-floor surgical suite. It is a 1,500-square-foot renovation, not a new building.
Is a new hospital being built at this address?
The TDLR record describes a renovation within Memorial Hermann Sugar Land Hospital: relocation of an existing anesthesia workroom, office and sleep room. It does not describe construction of a new hospital.
When was the Memorial Hermann anesthesia area project permitted?
The project was registered with TDLR on September 26, 2024. The registration, TABS2025001925, lists the project as closed.
How much will the Memorial Hermann Sugar Land renovation cost?
The applicant estimated the project cost at $70,000. The TDLR record describes a 1,500-square-foot renovation.
What is changing inside Memorial Hermann Sugar Land Hospital?
An existing anesthesia workroom, office and sleep room in the second-floor surgical suite are being relocated. The project registration was filed September 26, 2024.