1201 Lakeview Dr 1250 7th St
Sugar Land, TX 77478 · Fort Bend Christian Academy
Fort Bend Christian Academy plans an 11,000-square-foot addition
A one-level education building is planned as an addition to Fort Bend Christian Academy’s lower school, along with an interior renovation to combine two classrooms into a dance/theater room. The project was registered with TDLR on November 11, 2024, under project number TABS2025005226. The applicant’s estimated project cost is $5,233,166.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2024
- since Nov 11, 2024
- Largest scope
- 11,000 sf
- Estimated cost
- $5.2M
- state registration
Where this project stands
Under constructionFort Bend Christian Academy Middle School Addition
11,000 sq ft · $5.2M est.
- RegisteredNov 11, 2024
- Plan review
- ConstructionApr '25 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectOne-level education building to the existing lower school building. also interior renovation to combine two classrooms into one dance/theater room. — fort bend christian academy
TDLR project registrationAdditions to Existing BuildingReview Complete11,000 sq ft$5.2M est.- Project #
- TABS2025005226
- Tenant / owner
- Fort Bend Christian Academy Middle School Addition
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1201 Lakeview Dr 1250 7th St
What is being built at 1201 Lakeview Drive in Sugar Land?
A one-level education building is planned as an addition to Fort Bend Christian Academy’s lower school. The project also includes combining two classrooms into a dance/theater room.
Is Fort Bend Christian Academy getting a middle school addition?
Yes. The TDLR registration describes an 11,000-square-foot addition to the existing lower school building. It was filed on November 11, 2024.
When was the Fort Bend Christian Academy addition registered?
The project was registered with TDLR on November 11, 2024. Its registration number is TABS2025005226.
How much will the Fort Bend Christian Academy addition cost?
The applicant’s estimated cost for the project is $5,233,166. This is an estimate, not a confirmed final cost.
What renovations are included in the Fort Bend Christian Academy project?
The registration describes an interior renovation to combine two classrooms into one dance/theater room, in addition to the one-level education building.
What is being built near Fort Bend Christian Academy?
At Fort Bend Christian Academy, a one-level education building is planned as an addition to the lower school, with an interior classroom renovation also included. TDLR recorded the project on November 11, 2024.
Also being built nearby
All of 77478- 1201 Lakeview Drive · Fort Bend Christian AcademyFeb 8, 2024Fort bend christian academy - phase one projects — additions to existing building — addition of a new locker room to the existing gymnasium, the partial renovation/addition to the existing field house, the addition of a security vestibule to the existing upper school building, and the renovation to the lower school entry
- 200 Gillingham Lane, Sugar Land, TX 77478 · Building 200Feb 26, 2024Project condor — renovation/alteration — tenant remodel of 18,200 sq ft of the existing single story office/research building. scope of work includes: partial removal of non-structural interior partitions, new interior finishes, millwork, ceilings, lighting, and flooring · 290 m away
- 200 Gillingham Lane · Schlumberger Technology CorporationSep 4, 2024Lean to vestibule — new construction — pemb lean-to addition for vestibule to building. 170 · 290 m away
- 210 Schlumberger Dr · Schlumberger Technology CorporationSep 10, 2024High tower cafe — renovation/alteration — interior remodel of existing dining hall · 536 m away
- 110 Schlumberger Dr · Schlumberger Technology CorporationMar 25, 2026Slb hfe renovation — renovation/alteration — interior tenant remodel on level 1 & level 2 in the existing office building. the scope consists of updating interior finishes, updating the existing stair railing, new light fixtures, & minor adjustments to hvac, electrical outlets, & switches · 536 m away
- 300 Schlumberger Drive · Building 300Sep 12, 2024Slb room 244 remodel — renovation/alteration — the scope of work consists of interior, non-structural wall demolition and construction, demolition of existing finishes and the application of new finishes as well as adjustments to the existing mechanical & electrical · 537 m away