200 Gillingham Lane
Sugar Land, TX 77478 · Schlumberger Technology Corporation
Lean-to vestibule addition planned for Building 170
A 170-square-foot lean-to vestibule addition for Building 170 at 200 Gillingham Lane was registered with the Texas Department of Licensing and Regulation on September 4, 2024. The two project registrations list the work as new construction and show the projects as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 4, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Sep 4, 2024
- since Sep 4, 2024
- Largest scope
- 170 sf
- Estimated cost
- $150K
- state registration
Where this project stands
CompletedLean to Vestibule
170 sq ft · $150K est.
- RegisteredSep 4, 2024
- Plan review
- ConstructionOct '24 – Apr '25
- Inspected
- Closed
Ran as a 7-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsPemb lean-to addition for vestibule to building. 170 — building 170
TDLR project registrationNew ConstructionProject Closed170 sq ft$150K est.- Project #
- TABS2025000167
- Tenant / owner
- Lean To Vestibule
- Design firm
- Pro
- Contact
- Pro
Pemb lean-to addition for vestibule to — building 170
TDLR project registrationNew ConstructionProject Closed170 sq ft$150K est.- Project #
- TABS2025000170
- Tenant / owner
- Lean-To Vestibule
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 200 Gillingham Lane
What is being built at 200 Gillingham Lane in Sugar Land?
A 170-square-foot lean-to vestibule addition for Building 170 was registered with the Texas Department of Licensing and Regulation on September 4, 2024.
Which building at 200 Gillingham Lane is getting the vestibule addition?
The project descriptions identify Building 170 as the building receiving the lean-to vestibule addition.
How large is the vestibule addition at 200 Gillingham Lane?
The TDLR registrations list the project at 170 square feet.
When was the Building 170 vestibule project filed?
The two TDLR project registrations are dated September 4, 2024. They are listed as closed.
What's being built near Schlumberger Technology Corporation in Sugar Land?
At 200 Gillingham Lane, the TDLR records describe a 170-square-foot lean-to vestibule addition for Building 170. The nearby Schlumberger Technology Corporation listing is at 110 Schlumberger Drive.
Is the 200 Gillingham Lane project a new building?
The registrations describe a lean-to vestibule addition to existing Building 170, not a new standalone building.
Also being built nearby
All of 77478- 200 Gillingham Lane, Sugar Land, TX 77478 · Building 200Feb 26, 2024Project condor — renovation/alteration — tenant remodel of 18,200 sq ft of the existing single story office/research building. scope of work includes: partial removal of non-structural interior partitions, new interior finishes, millwork, ceilings, lighting, and flooring
- 1201 Lakeview Dr 1250 7th St · Fort Bend Christian AcademyNov 11, 2024Fort bend christian academy middle school addition — additions to existing building — one-level education building to the existing lower school building. also interior renovation to combine two classrooms into one dance/theater room · 290 m away
- 1201 Lakeview Drive · Fort Bend Christian AcademyFeb 8, 2024Fort bend christian academy - phase one projects — additions to existing building — addition of a new locker room to the existing gymnasium, the partial renovation/addition to the existing field house, the addition of a security vestibule to the existing upper school building, and the renovation to the lower school entry · 290 m away
- 110 Schlumberger Dr · Schlumberger Technology CorporationMar 25, 2026Slb hfe renovation — renovation/alteration — interior tenant remodel on level 1 & level 2 in the existing office building. the scope consists of updating interior finishes, updating the existing stair railing, new light fixtures, & minor adjustments to hvac, electrical outlets, & switches · 357 m away
- 210 Schlumberger Dr · Schlumberger Technology CorporationSep 10, 2024High tower cafe — renovation/alteration — interior remodel of existing dining hall · 379 m away
- 300 Schlumberger Drive · Building 300Sep 12, 2024Slb room 244 remodel — renovation/alteration — the scope of work consists of interior, non-structural wall demolition and construction, demolition of existing finishes and the application of new finishes as well as adjustments to the existing mechanical & electrical · 399 m away