2401 S 31st St
Temple, TX 76504 · Scott & White Mem Hospital &
MRI equipment replacement at 2401 S 31st St
A 908-square-foot MRI area at Baylor Scott & White Temple is scheduled for equipment replacement and interior updates, including new ceiling, flooring, casework, and structural supports. The TDLR project registration was filed August 18, 2026; the applicant estimates the project cost at $1.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2026
- since Aug 18, 2026
- Largest scope
- 908 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Approved · construction starts Dec 1, 2026MRI Replacement
908 sq ft · $1.5M est.
- RegisteredAug 18, 2026
- Plan review
- ConstructionDec '26 – Mar '27
- Inspected
- Closed
A 4-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectMri equipment replacement, new ceiling, new flooring, new casework, structural supports for the mri & ups. — baylor scott & white - temple
TDLR project registrationRenovation/AlterationReview Complete908 sq ft$1.5M est.- Project #
- TABS2026028085
- Tenant / owner
- Mri Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2401 S 31st St
What is being built at 2401 S 31st St in Temple?
A registered renovation will replace MRI equipment and update the area with new ceiling, flooring, casework, and structural supports. The 908-square-foot project is listed as MRI Replacement, TDLR registration TABS2026028085.
When was the MRI replacement project permitted?
The TDLR project registration was filed August 18, 2026. It is listed as a renovation/alteration with status “Review Complete.”
How much will the MRI replacement at Baylor Scott & White Temple cost?
The applicant’s estimated cost for the project is $1.5 million, according to TDLR registration TABS2026028085.
Is a new building going up at 2401 S 31st St?
The filing describes an MRI equipment replacement and interior updates, not a new building. The registered work covers 908 square feet.
What's happening near the BSW Temple Cam Tower Expansion?
At 2401 S 31st St, a separate TDLR filing covers MRI equipment replacement and interior updates. It was filed August 18, 2026, under registration TABS2026028085.
Is Baylor Scott & White Temple replacing MRI equipment?
A TDLR registration for 2401 S 31st St describes MRI equipment replacement, new finishes, and structural supports for the MRI and UPS. The filing date is August 18, 2026.
Also being built nearby
All of 76504- 2401 S. 31st Street · Scott & White Memorial HospitalApr 20, 2026Level 02: fluoroscopy c243-2096 equipment replacement project — renovation/alteration — equipiment replacement and finish upgrade of a 445sf fluoroscopy room
- 2401 S. 31st St, Temple · Baylor Scott & White HealthJun 11, 2025Temple memorial urology - or3/or4 — renovation/alteration — 2 original ors, with their adjoining sub-sterile room, are being renovated into 2 larger ors connected to the sterile core
- 2401 South 31st Street · Scott & White Memorial HospitalJul 29, 2026Level 02: procedure 275 (end of life) equipment replacement — renovation/alteration — equipment replacement project of a 731sq interventional radiology room
- 2401 South 31st St · Bsw Medical Center - TempleSep 19, 2025Executive health center refresh - phase 2 — renovation/alteration — renovation to existing executive suite
- 2401 S 31st St · Baylor Scott & White Medical Center - Temple MemorialAug 13, 2025Temple memorial new cath lab / ep — renovation/alteration — this is a single-phase renovation project at baylor scott & white memorial hospital in temple, texas. within the original cath lab department, this project will fit-out the one shelled room originally intended for the fourth cath lab at this facility
- 2401 S 31st · Baylor Scott & White Medical CenterApr 30, 2026Bsw temple cam tower expansion — additions to existing building — vertical addition to existing tower on bsw temple campus. levels 6-8 will be built at the cam south tower, with 6-7 being shell space and 8 being a full build-out. level 8 will consist of 28 universal care rooms and supporting spaces
- 2320 S 31st Street · Morris Venture Partners Vi LLCApr 4, 2024Fed ex office - shoppes on the hill — new construction — 2,082 s.f. interior finishout of fed ex office store in virgin shell lease space in the shoppes on the hill shopping center, temple, tx · 30 m away
- 1728 Scott Boulevard · Qr Automation Technologies INCMar 4, 2026Sprint thru shell — new construction — 6,260 sq ft of new construction lease space · 160 m away
- 2110 S 31st · Jms Texas LLCApr 30, 2025Native gulf coast foods - temple — renovation/alteration — replace the kitchen wall and rebuild the kitchen area and serving counter. replace signage outside and repair ac units on roof · 202 m away
- 2102 S.31st. Street · The District Temple TexasMay 28, 2024Egg tuck — renovation/alteration — setting up a breakfast sandwich shop requires partition wall, plumbing, and electrical, in a vacant space · 210 m away
- 1850 Scott Blvd · Lonestar Flower LLCSep 30, 2024Springhill suites temple — new construction — new 4-story hotel with basement · 300 m away
- 2420 S 37th St · Central Counties ServicesJul 25, 2025Temple community service center — renovation/alteration — 8500 sq ft building with interior finish out of approximately 4500 square feet. site work to include new fencing. two wall removals, and two door removals for new breakroom · 411 m away