2401 S. 31st St, Temple
Temple, TX 76508 · Baylor Scott & White Health
Two operating rooms to be renovated at Baylor Scott & White
A renovation at Baylor Scott & White Medical Center in Temple will convert two operating rooms and an adjoining sub-sterile room into two larger operating rooms connected to the sterile core. The project was registered with TDLR on June 11, 2025, and is listed as inspection complete. The applicant’s estimated project cost is $1,872,173.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2025
- since Jun 11, 2025
- Largest scope
- 1,140 sf
- Estimated cost
- $1.9M
- state registration
Where this project stands
Inspected · closing outTEMPLE MEMORIAL UROLOGY - OR3/OR4
1,140 sq ft · $1.9M est.
- RegisteredJun 11, 2025
- Plan review
- ConstructionJul '25 – Feb '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project2 original ors, with their adjoining sub-sterile room, are being renovated into 2 larger ors connected to the sterile core — temple memorial
TDLR project registrationRenovation/AlterationInspection Complete1,140 sq ft$1.9M est.- Project #
- TABS2025021021
- Tenant / owner
- Temple Memorial Urology - Or3/Or4
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2401 S. 31st St, Temple
What is being built at 2401 S. 31st St. in Temple?
A hospital renovation will convert two existing operating rooms and their adjoining sub-sterile room into two larger operating rooms connected to the sterile core. The project is listed as inspection complete.
What is being renovated near Baylor Scott & White Medical Center in Temple?
The Temple Memorial Urology - OR3/OR4 project involves renovating two existing operating rooms into two larger rooms connected to the sterile core. TDLR registration TABS2025021021 was filed June 11, 2025.
When was the Temple Memorial Urology operating room project permitted?
The project was registered with the Texas Department of Licensing and Regulation on June 11, 2025. Its registration number is TABS2025021021.
How much will the operating room renovation at 2401 S. 31st St. cost?
The applicant’s TDLR estimate for the project is $1,872,173. This is an estimate, not a confirmed final cost.
How large is the Temple Memorial Urology renovation?
The TDLR registration lists the project at 1,140 square feet. It describes renovations to two operating rooms and an adjoining sub-sterile room.
Also being built nearby
All of 76508- 2401 S 31st St · Scott & White Mem Hospital &Aug 18, 2026Mri replacement — renovation/alteration — mri equipment replacement, new ceiling, new flooring, new casework, structural supports for the mri & ups
- 2401 S. 31st Street · Scott & White Memorial HospitalApr 20, 2026Level 02: fluoroscopy c243-2096 equipment replacement project — renovation/alteration — equipiment replacement and finish upgrade of a 445sf fluoroscopy room
- 2401 South 31st Street · Scott & White Memorial HospitalJul 29, 2026Level 02: procedure 275 (end of life) equipment replacement — renovation/alteration — equipment replacement project of a 731sq interventional radiology room
- 2401 South 31st St · Bsw Medical Center - TempleSep 19, 2025Executive health center refresh - phase 2 — renovation/alteration — renovation to existing executive suite
- 2401 S 31st St · Baylor Scott & White Medical Center - Temple MemorialAug 13, 2025Temple memorial new cath lab / ep — renovation/alteration — this is a single-phase renovation project at baylor scott & white memorial hospital in temple, texas. within the original cath lab department, this project will fit-out the one shelled room originally intended for the fourth cath lab at this facility
- 2401 S 31st · Baylor Scott & White Medical CenterApr 30, 2026Bsw temple cam tower expansion — additions to existing building — vertical addition to existing tower on bsw temple campus. levels 6-8 will be built at the cam south tower, with 6-7 being shell space and 8 being a full build-out. level 8 will consist of 28 universal care rooms and supporting spaces
- 2320 S 31st Street · Morris Venture Partners Vi LLCApr 4, 2024Fed ex office - shoppes on the hill — new construction — 2,082 s.f. interior finishout of fed ex office store in virgin shell lease space in the shoppes on the hill shopping center, temple, tx · 30 m away
- 1728 Scott Boulevard · Qr Automation Technologies INCMar 4, 2026Sprint thru shell — new construction — 6,260 sq ft of new construction lease space · 160 m away
- 2110 S 31st · Jms Texas LLCApr 30, 2025Native gulf coast foods - temple — renovation/alteration — replace the kitchen wall and rebuild the kitchen area and serving counter. replace signage outside and repair ac units on roof · 202 m away
- 2102 S.31st. Street · The District Temple TexasMay 28, 2024Egg tuck — renovation/alteration — setting up a breakfast sandwich shop requires partition wall, plumbing, and electrical, in a vacant space · 210 m away
- 1850 Scott Blvd · Lonestar Flower LLCSep 30, 2024Springhill suites temple — new construction — new 4-story hotel with basement · 300 m away
- 2420 S 37th St · Central Counties ServicesJul 25, 2025Temple community service center — renovation/alteration — 8500 sq ft building with interior finish out of approximately 4500 square feet. site work to include new fencing. two wall removals, and two door removals for new breakroom · 411 m away