groundranger
Historic · latest filing Mar 2024Commercial

19823 Hufsmith-Kohrville Road

Tomball, TX 77375 · Harris County

Hufsmith-Kohrville Road Segment 3A boulevard project

A four-lane concrete boulevard with a raised median, storm sewer, sidewalks and traffic signals is planned for Hufsmith-Kohrville Road and part of Boudreaux Road. The TDLR project registration was filed March 15, 2024; the applicant’s estimated project cost is $18,405,601.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 15, 2024

Projects
1
1 filings
Latest filing
Mar 15, 2024
since Mar 15, 2024
Largest scope
767,147 sf
Estimated cost
$18M
state registration

Where this project stands

Under construction

Hufsmith-Kohrville Road Segment 3A

767,147 sq ft · $18M est.

  1. RegisteredMar 15, 2024
  2. Plan review
  3. ConstructionJun '24 – Jul '27
  4. Inspected
  5. Closed
80% through of a 37-month buildJun 1, 2024 → Jul 1, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. The construction of a 4-lane concrete boulevard with raised median, storm sewer, sidewalk, and traffic signals in 100-ft row on hufsmith-kohrville road from 700 ft north of ezekiel rd to 400 ft north of boudreaux rd, including 600 ft of boudreaux rd. — hufsmith-kohrville road

    TDLR project registrationNew ConstructionReview Complete767,147 sq ft$18M est.
    Tenant / owner
    Hufsmith-Kohrville Road Segment 3a
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 19823 Hufsmith-Kohrville Road

What is being built at 19823 Hufsmith-Kohrville Road?

The TDLR registration describes a four-lane concrete boulevard with a raised median, storm sewer, sidewalks and traffic signals. The project is named Hufsmith-Kohrville Road Segment 3A.

When was the Hufsmith-Kohrville Road Segment 3A project filed?

The TDLR registration, TABS2024013906, was filed March 15, 2024.

Where does the Hufsmith-Kohrville Road construction take place?

The project runs from 700 feet north of Ezekiel Road to 400 feet north of Boudreaux Road, with 600 feet of Boudreaux Road included.

What features are included in the Hufsmith-Kohrville Road project?

The registration lists a four-lane concrete boulevard, raised median, storm sewer, sidewalks and traffic signals in a 100-foot right-of-way.

What is the estimated cost of the Hufsmith-Kohrville Road project?

The applicant’s estimated cost for the project is $18,405,601, according to the TDLR registration filed March 15, 2024.

What is being built near Hufsmith Kohrville Property on Boudreaux Road?

The nearby landmark listing places Hufsmith Kohrville Property, at 11423 Boudreaux Road, 335 meters from this project. The project description includes 600 feet of Boudreaux Road.

Also being built nearby

All of 77375
Email me when it passes inspection