203 Blue Ridge Trl
West Lake Hills, TX 78746
Emergency electrical repair at 203 Blue Ridge Trail
An emergency electrical repair at the residence included replacing the meter can and exterior electrical panel. The City of Austin permit was filed on March 20, 2026, and is marked final; the permit description says the work was completed and inspected before the filing.
Summarized from City of Austin records · updated Mar 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 20, 2026
- since Mar 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledThis request pertains to an emergency service repair that was already completed and inspected last saturday. we had to replace the meter can and the exterior panel because the existing equipment was very old and was causing issues
- AppliedMar 16, 2026
- IssuedMar 20, 2026
- WorkMar '26 – Mar '26
- Final inspectionMar 25, 2026
Passed final inspection Mar 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectThis request pertains to an emergency service repair that was already completed and inspected last saturday. we had to replace the meter can and the exterior panel because the existing equipment was very old and was causing issues
This request pertains to an emergency service repair that was already completed and inspected last saturday. we had to replace the meter can and the exterior panel because the existing equipment was very old and was causing issues
City of Austin permitElectrical PermitFinal- Record
- 2026-031451 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 203 Blue Ridge Trl
What is happening at 203 Blue Ridge Trail?
A City of Austin electrical permit covers an emergency repair that replaced the meter can and exterior panel. The permit, 2026-031451 EP, was filed March 20, 2026.
Is a new home being built at 203 Blue Ridge Trail?
The record does not describe new home construction. It covers an emergency electrical service repair at the residence.
What electrical work was permitted at 203 Blue Ridge Trail?
The permit description says the meter can and exterior panel were replaced because the existing equipment was old and causing issues. The permit is marked final.
When was the electrical permit for 203 Blue Ridge Trail filed?
The City of Austin filed electrical permit 2026-031451 EP on March 20, 2026. Its status is final.
What work is happening near Greenwood/Hill Country Specialists?
At 203 Blue Ridge Trail, about 221 meters from Greenwood/Hill Country Specialists, a City of Austin permit records an emergency electrical repair. It was filed March 20, 2026, and is marked final.
Also being built nearby
All of 78746- 300 Stonewall LnMar 13, 2024Etj new service for sfr · 77 m away
- 201 Westbrook DrAug 15, 2025Install new 9.350 kw rooftop solar system and 20khw energy storage system for existing residential only · 115 m away
- 304 Stonewall LnMar 16, 2026Install temporary 200a 120/240v overhead service pole for construction power · 136 m away
- 3421 Bee Cave RdNov 10, 2026[etj] fix electrical service tree fell on riser we fixed no one was living there but now ready for reconnect · 221 m away
- 3423 Bee Cave RdJun 6, 202483.08kwdc roof mounted pv (westlake full purpose) · 221 m away
- 3423-C Bee Cave Road · Greenwood/Hill Country Specialists LLCApr 9, 2026Forest family dentistry west lake hills — new construction — 2,182 sq ft interior finish-out · 221 m away
- 3423 Bee Caves Rd · Hill Country Specialists LLCAug 28, 2026The house by savor + sweat — renovation/alteration — finish out of a second generation space for a fitness studio · 221 m away
- 3355 Bee Caves Road, Suites 403 & 404 · Birdhouse Atx, LLCFeb 10, 2025Birdhouse — renovation/alteration — interior renovation of 3,389 sq ft office. limited select demolition of interior walls, new paint, carpet, and act ceiling. replacement of light fixtures · 246 m away
- 302 Briarwood TrlFeb 26, 2024Homebuilder loop for sfr permit ref#: 2024-020167 ep · 254 m away
- 304 Blue Ridge TrlAug 15, 2024Etj irrigation system for new residence · 261 m away
- 103 Bulian LnAug 1, 2024Repair :disconnect and reconnect power to residence. electrical panel and riser became unfastned from house wall.service panel and riser have been reattached · 271 m away
- 3520 Bee Caves Road · American BankApr 1, 2024American bank - westlake hills second floor office addition — renovation/alteration — remodeling 3 office spaces on the second floor · 274 m away