groundranger
Recent · latest filing Mar 2026Residential

304 Stonewall Ln

West Lake Hills, TX 78746

Temporary construction power permitted at 304 Stonewall Ln

A temporary 200-amp overhead electrical service pole for construction power was permitted at 304 Stonewall Ln on March 16, 2026. The City of Austin permit, 2026-030231 EP, is marked final; the record does not specify what is being built.

Summarized from City of Austin records · updated Mar 16, 2026

Projects
1
1 filings
Latest filing
Mar 16, 2026
since Mar 16, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install temporary 200a 120/240v overhead service pole for construction power

  1. AppliedMar 12, 2026
  2. IssuedMar 16, 2026
  3. WorkMar '26 – Mar '26
  4. Final inspectionMar 30, 2026

Passed final inspection Mar 30, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install temporary 200a 120/240v overhead service pole for construction power

    Install temporary 200a 120/240v overhead service pole for construction power

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 304 Stonewall Ln

What is being built at 304 Stonewall Ln?

The March 16, 2026 City of Austin permit is for a temporary 200-amp overhead service pole to provide construction power. It does not identify the project being built.

What does permit 2026-030231 EP cover?

It covers installation of a temporary 200-amp, 120/240-volt overhead service pole for construction power. The permit is marked final.

When was the construction power permit filed at 304 Stonewall Ln?

The permit was filed on March 16, 2026.

Is a new home being built at 304 Stonewall Ln?

The available record does not confirm that. It documents a temporary electrical service pole for construction power, but does not state the type of project.

What’s happening near Greenwood/Hill Country Specialists on Bee Cave Road?

At 304 Stonewall Ln, about 357 meters from Greenwood/Hill Country Specialists, a City of Austin permit covers a temporary overhead electrical service pole for construction power. It was filed March 16, 2026.

Also being built nearby

All of 78746
Email me when a new permit is filed