207 Mc Connell Dr
West Lake Hills, TX 78746
207 Mc Connell Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 207 Mc Connell Dr, West Lake Hills, TX 78746. The most recent, filed April 17, 2024, covers: “Rebuild 200a main oh service panel”.
Compiled from City of Austin records · updated Apr 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 17, 2024
- since Apr 17, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRebuild 200a main oh service panel
- AppliedApr 16, 2024
- IssuedApr 17, 2024
- WorkApr '24 – Jun '24
- Final inspectionJun 13, 2024
Passed final inspection Jun 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRebuild 200a main oh service panel
Rebuild 200a main oh service panel
City of Austin permitElectrical PermitFinal- Record
- 2024-047167 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 207 Mc Connell Dr
What is being built at 207 Mc Connell Dr?
The latest filing (City of Austin permit 2024-047167 EP, April 17, 2024) covers rebuild 200a main oh service panel.
How many permits and filings does 207 Mc Connell Dr have?
1 filing across 1 project, from April 17, 2024 to April 17, 2024.
What is being built near Dental Office - Dr. Tomblyn in West Lake Hills?
207 Mc Connell Dr is about 251 m from Dental Office - Dr. Tomblyn (4407 Bee Cave Rd). Its latest filing is for rebuild 200a main oh service panel.
Is there other construction near 207 Mc Connell Dr?
Yes. Nearby filings include 205 Mc Connell Dr (15 tunnel below the pier and beam foundation to replace the entire drain system. excludes kitchen and utility drain lines. 1 access hole in front, Jul 31, 2026); 208 Mc Connell Dr (need disconnect/reconnect to install 22kw home standby generator, Jun 14, 2024); 303 Mc Connell Dr (no longer serviced by aw - 10 tunnel below the foundation to replace lower level bathroom drain line and 20 trench to replace main sewer line to grinder pump. one access hole in back, Jan 17, 2025).
How do I get alerts for new permits at 207 Mc Connell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 205 Mc Connell DrJul 31, 202615 tunnel below the pier and beam foundation to replace the entire drain system. excludes kitchen and utility drain lines. 1 access hole in front · 28 m away
- 208 Mc Connell DrJun 14, 2024Need disconnect/reconnect to install 22kw home standby generator · 68 m away
- 303 Mc Connell DrJan 17, 2025No longer serviced by aw - 10 tunnel below the foundation to replace lower level bathroom drain line and 20 trench to replace main sewer line to grinder pump. one access hole in back · 102 m away
- 211 Westhaven DrJul 9, 2025Request electrical permit for a temporary loop ***west lake hills full purpose · 124 m away
- 207 West Spring DrDec 19, 2023Stand alone service only permit · 153 m away
- 205 West Spring DrApr 15, 2026New service in sfr in etj · 178 m away
- 305 Westhaven DrNov 17, 2023Upgrade existing electrical service · 197 m away
- 103 Mc Connell DrMar 27, 2026Install/replace 200 amp main breaker panel meter can and riser (overhead) · 204 m away
- 201 West Spring DrMay 21, 2024Temp t pole · 228 m away
- 309 Westhaven DrMar 13, 2024Upgrade main electric service · 232 m away
- 4407 Bee Cave Rd · Dental Office - Dr. TomblynFeb 5, 2025Dental office - dr. tomblyn — renovation/alteration — interior remodel · 251 m away
- 4609 Bee Caves Rd · Bogle Family RealtyApr 25, 2025Usa managed care organization — renovation/alteration — renovation in existing office business suite for new offices within suite · 254 m away