208 Mc Connell Dr
West Lake Hills, TX 78746
208 Mc Connell Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 208 Mc Connell Dr, West Lake Hills, TX 78746. The most recent, filed June 14, 2024, covers: “Need disconnect/reconnect to install 22kw home standby generator”.
Compiled from City of Austin records · updated Jun 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 14, 2024
- since Jun 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNeed disconnect/reconnect to install 22kw home standby generator
- AppliedJun 10, 2024
- IssuedJun 14, 2024
- WorkJun '24 – Jul '24
- Final inspectionJul 30, 2024
Passed final inspection Jul 30, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectNeed disconnect/reconnect to install 22kw home standby generator
Need disconnect/reconnect to install 22kw home standby generator
City of Austin permitElectrical PermitFinal- Record
- 2024-072879 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 208 Mc Connell Dr
What is being built at 208 Mc Connell Dr?
The latest filing (City of Austin permit 2024-072879 EP, June 14, 2024) covers need disconnect/reconnect to install 22kw home standby generator.
How many permits and filings does 208 Mc Connell Dr have?
1 filing across 1 project, from June 14, 2024 to June 14, 2024.
What is being built near Dental Office - Dr. Tomblyn in West Lake Hills?
208 Mc Connell Dr is about 236 m from Dental Office - Dr. Tomblyn (4407 Bee Cave Rd). Its latest filing is for need disconnect/reconnect to install 22kw home standby generator.
Is there other construction near 208 Mc Connell Dr?
Yes. Nearby filings include 207 Mc Connell Dr (rebuild 200a main oh service panel, Apr 17, 2024); 205 Mc Connell Dr (15 tunnel below the pier and beam foundation to replace the entire drain system. excludes kitchen and utility drain lines. 1 access hole in front, Jul 31, 2026); 303 Mc Connell Dr (no longer serviced by aw - 10 tunnel below the foundation to replace lower level bathroom drain line and 20 trench to replace main sewer line to grinder pump. one access hole in back, Jan 17, 2025).
How do I get alerts for new permits at 208 Mc Connell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 207 Mc Connell DrApr 17, 2024Rebuild 200a main oh service panel · 68 m away
- 205 Mc Connell DrJul 31, 202615 tunnel below the pier and beam foundation to replace the entire drain system. excludes kitchen and utility drain lines. 1 access hole in front · 81 m away
- 303 Mc Connell DrJan 17, 2025No longer serviced by aw - 10 tunnel below the foundation to replace lower level bathroom drain line and 20 trench to replace main sewer line to grinder pump. one access hole in back · 95 m away
- 211 Westhaven DrJul 9, 2025Request electrical permit for a temporary loop ***west lake hills full purpose · 187 m away
- 207 West Spring DrDec 19, 2023Stand alone service only permit · 210 m away
- 305 Westhaven DrNov 17, 2023Upgrade existing electrical service · 224 m away
- 205 West Spring DrApr 15, 2026New service in sfr in etj · 235 m away
- 4407 Bee Cave Rd · Dental Office - Dr. TomblynFeb 5, 2025Dental office - dr. tomblyn — renovation/alteration — interior remodel · 236 m away
- 4609 Bee Caves Rd · Bogle Family RealtyJun 4, 2025Chalk training — renovation/alteration — renovation of building shell space for a fitness/training facility · 237 m away
- 4609 Bee Caves Rd · Bogle Family RealtyApr 25, 2025Usa managed care organization — renovation/alteration — renovation in existing office business suite for new offices within suite · 237 m away
- 4613 Bee Cave Road · The Hills MedicalFeb 17, 2025Face austin med spa — renovation/alteration — interior renovation / alteration of an existing medical office · 238 m away
- 4615 Bee Caves Rd · The Hills Medical Office Ii, LtdFeb 8, 2024Fusion academy - interior refresh — renovation/alteration — interior refresh of existing tenant space to include replacement of flooring finishes, new paint, replacement of cabinetry, replacement of lighting, and upgrade from multi-user restrooms within suite to accessible all-gender single-user restrooms · 241 m away