groundranger
Historic · latest filing Jul 2024Commercial

4101 Bee Cave Road

West Lake Hills, TX 78746 · Eanes Independent School District

Eanes Elementary playground resurfacing in West Lake Hills

Eanes Independent School District registered a project to resurface an existing playground at 4101 Bee Cave Road, replacing artificial turf with poured-in-place rubber. The Texas Department of Licensing and Regulation records are dated May 15 and July 29, 2024, and describe a 13,150-square-foot project. The applicant’s estimated project cost was $250,000; both registrations are marked closed.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 29, 2024

Projects
2
2 filings
Latest filing
Jul 29, 2024
since May 15, 2024
Largest scope
13,150 sf
Estimated cost
$250K
state registration

Where this project stands

Completed

Playground resurfacing project

13,150 sq ft · $250K est.

  1. RegisteredJul 29, 2024
  2. Plan review
  3. ConstructionJul '24 – Oct '24
  4. Inspected
  5. Closed

Ran as a 2-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Resurfacing an existing playground from artificial turf to poured-in-place rubber. 13,150 sq ft — eanes elementary - eanes isd

    TDLR project registrationRenovation/AlterationProject Closed13,150 sq ft$250K est.
    Tenant / owner
    Playground Resurfacing Project
    Design firm
    Pro
    Contact
    Pro
  2. Resurfacing an existing playground from artificial turf to poured-in-place rubber. 13,150 sq ft — eanes elementary - eanes isd

    TDLR project registrationRenovation/AlterationProject Closed13,150 sq ft$250K est.
    Tenant / owner
    Playground Resurfacing Project
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 4101 Bee Cave Road

What is being built at 4101 Bee Cave Road?

The project is resurfacing an existing playground at Eanes Elementary, replacing artificial turf with poured-in-place rubber. It is a renovation, not a new building.

What is planned for the Eanes Elementary playground?

The TDLR project description says the existing playground will be resurfaced with poured-in-place rubber in place of artificial turf.

When was the playground resurfacing project permitted?

The TDLR records are dated May 15 and July 29, 2024. Both registrations are marked closed.

How large is the Eanes Elementary playground project?

The project registration lists 13,150 square feet.

How much is the Eanes Elementary playground project expected to cost?

The applicant’s estimated cost in the TDLR records is $250,000. This is an estimate for the project, not a reported final cost.

What is being changed near Schoolyard on Bee Cave Road?

At 4101 Bee Cave Road, Eanes Independent School District registered a project to replace the existing playground’s artificial turf with poured-in-place rubber. Schoolyard is listed nearby at 4201 Bee Caves Road.

Also being built nearby

All of 78746
Get alerts for 4101 Bee Cave Road