4101 Bee Cave Road
West Lake Hills, TX 78746 · Eanes Independent School District
Eanes Elementary playground resurfacing in West Lake Hills
Eanes Independent School District registered a project to resurface an existing playground at 4101 Bee Cave Road, replacing artificial turf with poured-in-place rubber. The Texas Department of Licensing and Regulation records are dated May 15 and July 29, 2024, and describe a 13,150-square-foot project. The applicant’s estimated project cost was $250,000; both registrations are marked closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 29, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jul 29, 2024
- since May 15, 2024
- Largest scope
- 13,150 sf
- Estimated cost
- $250K
- state registration
Where this project stands
CompletedPlayground resurfacing project
13,150 sq ft · $250K est.
- RegisteredJul 29, 2024
- Plan review
- ConstructionJul '24 – Oct '24
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsResurfacing an existing playground from artificial turf to poured-in-place rubber. 13,150 sq ft — eanes elementary - eanes isd
TDLR project registrationRenovation/AlterationProject Closed13,150 sq ft$250K est.- Project #
- TABS2024024138
- Tenant / owner
- Playground Resurfacing Project
- Design firm
- Pro
- Contact
- Pro
Resurfacing an existing playground from artificial turf to poured-in-place rubber. 13,150 sq ft — eanes elementary - eanes isd
TDLR project registrationRenovation/AlterationProject Closed13,150 sq ft$250K est.- Project #
- TABS2024018548
- Tenant / owner
- Playground Resurfacing Project
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4101 Bee Cave Road
What is being built at 4101 Bee Cave Road?
The project is resurfacing an existing playground at Eanes Elementary, replacing artificial turf with poured-in-place rubber. It is a renovation, not a new building.
What is planned for the Eanes Elementary playground?
The TDLR project description says the existing playground will be resurfaced with poured-in-place rubber in place of artificial turf.
When was the playground resurfacing project permitted?
The TDLR records are dated May 15 and July 29, 2024. Both registrations are marked closed.
How large is the Eanes Elementary playground project?
The project registration lists 13,150 square feet.
How much is the Eanes Elementary playground project expected to cost?
The applicant’s estimated cost in the TDLR records is $250,000. This is an estimate for the project, not a reported final cost.
What is being changed near Schoolyard on Bee Cave Road?
At 4101 Bee Cave Road, Eanes Independent School District registered a project to replace the existing playground’s artificial turf with poured-in-place rubber. Schoolyard is listed nearby at 4201 Bee Caves Road.
Also being built nearby
All of 78746- 4101 Bee Caves Road · Eanes Independent School DistrictJul 3, 2025Playground resurfacing project — renovation/alteration — resurfacing of an existing playground from artificial turf to poured in place rubber - 26,000sf
- 4201 Bee Caves Rd · Schoolyard LtdFeb 17, 2025Dr. holly phillip — renovation/alteration — new interior construction of a 1846 square foot dental office within an existing core and shell office building. space includes treatment rooms, private offices, workstations, a lab, break room, reception, waiting & associated support spaces · 123 m away
- 103 Mc Connell DrMar 27, 2026Install/replace 200 amp main breaker panel meter can and riser (overhead) · 134 m away
- 4010 Bee Cave Rd · City Of West Lake HillsFeb 25, 2025New construction office building in the etj · 165 m away
- 304 Camp Craft RdJul 1, 2024A reconnect/disconnect for a solar system to existing commercial only. address is located in the etj · 217 m away
- 102 Westlake Drive · Westlake Office Building LPNov 19, 2024Parker, adam — renovation/alteration — tenant finish-out · 273 m away
- 3901 Bee Cave RdNov 3, 2026Installing 187.62 pv rooftop solar in west lake hills jurisdiction · 274 m away
- 204 Eanes School RdJul 2, 2024A reconnect/disconnect for a solar system to existing commercial only. address is located in the etj · 285 m away
- 205 Mc Connell DrJul 31, 202615 tunnel below the pier and beam foundation to replace the entire drain system. excludes kitchen and utility drain lines. 1 access hole in front · 295 m away
- 211 Westhaven DrJul 9, 2025Request electrical permit for a temporary loop ***west lake hills full purpose · 304 m away
- 4407 Bee Cave Rd · Dental Office - Dr. TomblynFeb 5, 2025Dental office - dr. tomblyn — renovation/alteration — interior remodel · 312 m away
- 207 Mc Connell DrApr 17, 2024Rebuild 200a main oh service panel · 320 m away