604 W Ledgeway
West Lake Hills, TX 78746
20.445 kW rooftop solar system permitted at 604 W Ledgeway
A 20.445 kW rooftop solar system is planned for the existing residence at 604 W Ledgeway. The City of Austin electrical permit was filed on November 10, 2025, and is marked final.
Summarized from City of Austin records · updated Nov 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 10, 2025
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 20.445 kw rooftop solar system for existing residential only in etj
- AppliedNov 7, 2025
- IssuedNov 10, 2025
- WorkNov '25 – May '26
- Final inspectionFeb 3, 2026
Passed final inspection Feb 3, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new 20.445 kw rooftop solar system for existing residential only in etj
Install new 20.445 kw rooftop solar system for existing residential only in etj
City of Austin permitElectrical PermitFinal- Record
- 2025-143936 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 604 W Ledgeway
What is being installed at 604 W Ledgeway?
A 20.445 kW rooftop solar system is listed for the existing residence. The City of Austin permit is 2025-143936 EP.
When was the solar permit filed for 604 W Ledgeway?
The electrical permit was filed on November 10, 2025.
Is the solar permit for a new home at 604 W Ledgeway?
No. The permit description says the rooftop solar system is for an existing residence.
What is the permit number for the solar installation at 604 W Ledgeway?
The City of Austin electrical permit number is 2025-143936 EP, filed November 10, 2025.
How large is the solar system planned for 604 W Ledgeway?
The permit describes a 20.445 kW rooftop solar system.
How much will the solar installation at 604 W Ledgeway cost?
The available permit record does not list a project valuation or cost estimate.
Also being built nearby
All of 78746- 716 Laurel Valley RdJan 6, 2024New construction sfr & casita westlake hills etj building 1&2 · 168 m away
- 404 Ledgeway RidgeMay 26, 2026Relocate service from meter to rack build 350 amp stand alone overhead rack service from pole 380499 and removing pole 265378 and un numbered pole in the middle wo#715754 · 289 m away
- 405 Cedar Oak DrMay 8, 2024Temporary meter loop for new construction home · 396 m away
- 405 Buckeye TrlAug 31, 2026Rebuild the main service underground. install new meter can main breaker panel grounding surge protection. ae scheduled outage required · 476 m away
- 304 Yaupon Valley RdJan 26, 2024Disconnect - reconnect installation of new 26kw permanent whole home generator (propane) connected to house meter and main panel. no meter can required. (james bylander) · 492 m away
- 407 Buckeye TrlAug 26, 2026Build overhead temporary electrical service to support construction of new sfh in etj · 522 m away
- 901 Live Oak Ridge RdOct 18, 2024Request to disconnect -installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 350 amp service with 1-200 amp ats and 1-150 amp ats · 548 m away
- 301 Laurel Valley RdNov 27, 2023Install level 2 ev charger per austin energys plug-in rebate guidelines · 561 m away
- 980 Live Oak CirApr 1, 2026Installation of ev charger · 566 m away
- 410 Spiller LnFeb 23, 202480kw whole home generator (natural gas) connected to house meter and main panel. no meter can required. (pabrai mohnish) · 579 m away
- 300 Laurel Valley RdJun 3, 2026Install t pole · 591 m away
More solar installs in 78746.