532 Hwy 87 S Orange, TX 77630
West Orange, TX 77630 · Neches Fcu
Neches FCU plans 4,183-square-foot building in Orange
A new Neches FCU credit union building with a drive-thru and a wall-mounted night depository is planned for 532 Hwy 87 S in West Orange. The project was registered with TDLR on June 12, 2025; the applicant estimated its cost at $2.71 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 12, 2025
- since Jun 12, 2025
- Largest scope
- 4,183 sf
- Estimated cost
- $2.7M
- state registration
Where this project stands
Under constructionNeches FCU - Orange BLDG
4,183 sq ft · $2.7M est.
- RegisteredJun 12, 2025
- Plan review
- ConstructionSep '25 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectDesign and build an approximate 4,183 sq ft credit union building with a drive-thru, and a thru-the-wall night depository on a 3.271 acre site at state highway 87 in orange, texas. — neches fcu
TDLR project registrationNew ConstructionReview Complete4,183 sq ft$2.7M est.- Project #
- TABS2025021146
- Tenant / owner
- Neches Fcu - Orange Bldg
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 532 Hwy 87 S Orange, TX 77630
What is being built at 532 Hwy 87 S in West Orange?
Neches FCU plans an approximately 4,183-square-foot credit union building with a drive-thru and a through-the-wall night depository. The project is listed as new construction in TDLR registration TABS2025021146, filed June 12, 2025.
Is Neches FCU building a new location in Orange, Texas?
TDLR records describe a new Neches FCU building on a 3.271-acre site along State Highway 87 in Orange. The project registration does not state when the building will open.
How large will the Neches FCU building be?
The TDLR project registration describes an approximately 4,183-square-foot building. It includes a drive-thru and a through-the-wall night depository.
How much will the Neches FCU project cost?
The applicant's estimated cost for the project is $2.71 million, according to TDLR registration TABS2025021146 filed June 12, 2025.
What is being built near Golden Triable Polymers Company in West Orange?
Neches FCU plans a new credit union building with a drive-thru at 532 Hwy 87 S, about 497 meters from Golden Triable Polymers Company at 580 Forman Rd. TDLR recorded the project on June 12, 2025.
Also being built nearby
All of 77630- 532 Hwy 87 S · Neches FcuNov 6, 2024Neches fcu - orange itm — new construction — complete installation of a single drive thru lane itm kiosk including sitework, paving, and site lighting
- 580 Forman Rd · Golden Triable Polymers Company LLCFeb 2, 2024Golden triangle polymers project — new construction — 1000 sq ft pre fabricated blast resistant building to be installed on developed industrial camps · 497 m away