2300 Spirit Of Texas Dr
Austin, TX 78617
Fastpark Phase 4 site plan approved in Austin
City of Austin records show a site plan for Fastpark Phase 4 at 2300 Spirit of Texas Drive was approved and released on September 14, 2026. Earlier site-plan cases at the address include Airport Fast Park Phase II and Airport Fast Park Phases III and IV.
Summarized from City of Austin records · updated Sep 14, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Sep 14, 2026
- since Apr 13, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMain disconnect is damaged at the handle power cannot be shut down in the event of an emergency. the disconnect will be replaced like for like at the fast park and relax 2300 spirit of texas dr. del valle tx 78617
- AppliedJan 11, 2024
- IssuedJan 16, 2024
- WorkJan '24 – Apr '24
- Final inspectionApr 4, 2024
Passed final inspection Apr 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
5 projectsMain disconnect is damaged at the handle power cannot be shut down in the event of an emergency. the disconnect will be replaced like for like at the fast park and relax 2300 spirit of texas dr. del valle tx 78617
Main disconnect is damaged at the handle power cannot be shut down in the event of an emergency. the disconnect will be replaced like for like at the fast park and relax 2300 spirit of texas dr. del valle tx 78617
City of Austin permitElectrical PermitFinal- Record
- 2024-003735 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2300 Spirit Of Texas Dr
What is being built at 2300 Spirit of Texas Drive?
City records list a site-plan case named Fastpark Phase 4, approved and released on September 14, 2026. The records do not provide a square-footage figure or project cost.
Was the Fastpark Phase 4 plan approved?
Yes. City of Austin case 13362447, filed September 14, 2026, is marked Approved and Released.
When was the latest project filed at 2300 Spirit of Texas Drive?
The latest listed filing is the Fastpark Phase 4 site-plan case, dated September 14, 2026.
What earlier Airport Fast Park projects are listed at this address?
City records include Airport Fast Park Phase II, approved and released in 2007, and Airport Fast Park Phase III and IV, approved and released in 2009. A separate Phase III and IV case filed in 2011 was withdrawn.
Is there a construction cost listed for Fastpark Phase 4?
No project cost is provided in the available City of Austin record for case 13362447.
Also being built nearby
All of 78617- 1615 Crozier LnOct 6, 2014Live oak brewery · 335 m away
- 2426 Cardinal LoopNov 6, 2026Aus tenant - sap aus parking phase 2 (lot construction) · 579 m away
- 1550 Thornberry RdDec 29, 2024Springhill suites hotel (sp-2023-0240c with r) · 580 m away
- 2463 E SH 71 Svrd WbMar 13, 2026Updating an old service that got damaged by a trash truck because overhead was to low replacing 2 disconnects 2 meter base and raising overhead ***per ec: the meters are together but it has 2 different addresses (the ones listed on the espa) but its mounted to the restaurant which is 2463 e sh 71 service road · 581 m away