Parking lot construction planned at 2426 Cardinal Loop
A site-plan case for AUS Tenant - SAP AUS Parking Phase 2, described as lot construction, was filed on November 6, 2026. The City of Austin lists the case as awaiting update; the record does not specify the lot’s size or estimated cost.
Summarized from City of Austin records · updated Nov 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2026
- since Nov 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2426 Cardinal Loop
What is being built at 2426 Cardinal Loop?
A City of Austin site-plan case describes Phase 2 of the AUS Tenant - SAP AUS project as parking lot construction. The case number is 13751965.
When was the parking project at 2426 Cardinal Loop filed?
The City of Austin case was filed on November 6, 2026.
What is the status of the 2426 Cardinal Loop site-plan case?
The City of Austin lists case 13751965 as awaiting update.
Is the project at 2426 Cardinal Loop a parking lot?
The case description identifies the work as parking lot construction for AUS Tenant - SAP AUS Parking Phase 2.
How large will the parking project at 2426 Cardinal Loop be?
The available City of Austin record does not list a square footage for the project.
What is the estimated cost of the parking construction at 2426 Cardinal Loop?
The available record does not provide an estimated project cost.
Also being built nearby
All of 78617- 2475 SH 71 SvrdJul 16, 2026Circle k · 160 m away
- 2401 Cardinal LoopJan 21, 2022Starbucks cardinal loop · 177 m away
- 2463 E SH 71 Svrd WbMar 13, 2026Updating an old service that got damaged by a trash truck because overhead was to low replacing 2 disconnects 2 meter base and raising overhead ***per ec: the meters are together but it has 2 different addresses (the ones listed on the espa) but its mounted to the restaurant which is 2463 e sh 71 service road · 188 m away
- 2601 Cardinal LoopNov 13, 2026Aus tenant - sap aus parking phase 2 (revision) · 214 m away
- 2454 Cardinal LoopJul 8, 2024Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed · 241 m away
- 2500 SH 71 SvrdMar 2, 2007Abia-west runway system, fillet widening at taxiway g and t (revision) · 283 m away
- 2502 SH 71 SvrdMar 2, 2007A-bia air cargo apron and road development · 284 m away
- 2512-1/2 Presidential BlvdSep 14, 2026Abia north reclaimed water loop main · 316 m away
- 2616-1/2 SH 71 SvrdOct 8, 2026Batx austin airport · 422 m away
- 2705 SH 71 SvrdJul 3, 2019Executesla · 473 m away
- 2300 Spirit Of Texas DrSep 14, 2026Fastpark phase 4 · 579 m away
- 9518 Hotel DrOct 29, 2015Abia scott airport parking development · 590 m away