Active · latest filing Sep 2026Commercial
2512-1/2 Presidential Blvd
Austin, TX 78719
ABIA North reclaimed-water loop main
A site plan for the ABIA North Reclaimed Water Loop Main was filed at 2512-1/2 Presidential Blvd. The City of Austin approved and released the case on September 14, 2026.
Summarized from City of Austin records · updated Sep 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 14, 2026
- since Sep 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2512-1/2 Presidential Blvd
What is being built at 2512-1/2 Presidential Blvd?
The City of Austin case is for the ABIA North Reclaimed Water Loop Main, a reclaimed-water infrastructure project.
Where is the ABIA North Reclaimed Water Loop Main project?
The project is listed at 2512-1/2 Presidential Blvd, Austin, TX 78719.
When was the site plan for the ABIA North Reclaimed Water Loop Main filed?
The City of Austin case was filed on September 14, 2026.
Has the ABIA North Reclaimed Water Loop Main site plan been approved?
Yes. Case 13169325 was marked Approved and Released on September 14, 2026.
Is a new building planned at 2512-1/2 Presidential Blvd?
The listed case is for a reclaimed-water loop main site plan, not a building project.
Also being built nearby
All of 78719- 2500 SH 71 SvrdMar 2, 2007Abia-west runway system, fillet widening at taxiway g and t (revision) · 42 m away
- 2502 SH 71 SvrdMar 2, 2007A-bia air cargo apron and road development · 47 m away
- 2463 E SH 71 Svrd WbMar 13, 2026Updating an old service that got damaged by a trash truck because overhead was to low replacing 2 disconnects 2 meter base and raising overhead ***per ec: the meters are together but it has 2 different addresses (the ones listed on the espa) but its mounted to the restaurant which is 2463 e sh 71 service road · 153 m away
- 2401 Cardinal LoopJan 21, 2022Starbucks cardinal loop · 156 m away
- 2475 SH 71 SvrdJul 16, 2026Circle k · 157 m away
- 2601 Cardinal LoopNov 17, 2026Aus tenant - sap aus parking phase 2 (revision) · 252 m away
- 2426 Cardinal LoopNov 6, 2026Aus tenant - sap aus parking phase 2 (lot construction) · 316 m away
- 2616-1/2 SH 71 SvrdOct 8, 2026Batx austin airport · 330 m away
- 9518 Hotel DrOct 29, 2015Abia scott airport parking development · 340 m away
- 9515 Hotel DrMar 2, 2007Hilton hotel at austin-bergstrom international airport · 444 m away
- 2705 SH 71 SvrdJul 3, 2019Executesla · 460 m away
- 2454 Cardinal LoopJul 8, 2024Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed · 475 m away