2454 Cardinal Loop
Austin, TX 78617
Generator transfer switch replacement at 2454 Cardinal Loop
Permits indicate replacement of an existing standby generator’s automatic transfer switch and docking station at 2454 Cardinal Loop, using the existing pad with no extension. Austin issued building, electrical and plumbing permits for the work between May 16 and July 8, 2024; all three are marked final.
Summarized from City of Austin records · updated Jul 8, 2024
- Projects
- 5
- 5 filings
- Latest filing
- Jul 8, 2024
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsReplace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed
Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed
City of Austin permitPlumbing PermitFinal- Record
- 2024-053786 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed
Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed
City of Austin permitElectrical PermitFinal- Record
- 2024-053786 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed
Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed
City of Austin permitBuilding PermitFinal- Record
- 2024-053786 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2454 Cardinal Loop
What is happening at 2454 Cardinal Loop in Austin?
Permits indicate replacement of an existing optional standby generator’s automatic transfer switch and docking station. The work uses the existing pad and does not require an extension.
Is a new building being built at 2454 Cardinal Loop?
The 2024 permits describe equipment replacement, not construction of a new building. They cover building, electrical and plumbing work.
When were permits issued for work at 2454 Cardinal Loop?
Austin issued the building permit on May 16, 2024, the electrical permit on May 21, and the plumbing permit on July 8. All three permits, numbered 2024-053786 BP, EP and PP, are marked final.
What equipment is being replaced at 2454 Cardinal Loop?
The permits describe replacement of an existing generator automatic transfer switch and docking station. The new equipment is to use the existing equivalent pad.
Is the work at 2454 Cardinal Loop complete?
The building, electrical and plumbing permits for the generator equipment replacement are all marked final. The permit records do not state a construction completion date.
What are the older project records for 2454 Cardinal Loop?
Austin records show a site plan case named Popham Elementary School Demolition Project and another named Del Valle Fire/EMS Station, both dated March 2, 2007, with status Approved and Released.
Also being built nearby
All of 78617- 2426 Cardinal LoopNov 6, 2026Aus tenant - sap aus parking phase 2 (lot construction) · 241 m away
- 2601 Cardinal LoopNov 13, 2026Aus tenant - sap aus parking phase 2 (revision) · 242 m away
- 2401 Cardinal LoopJan 21, 2022Starbucks cardinal loop · 321 m away
- 2475 SH 71 SvrdJul 16, 2026Circle k · 350 m away
- 2705 SH 71 SvrdJul 3, 2019Executesla · 361 m away
- 2616-1/2 SH 71 SvrdOct 8, 2026Batx austin airport · 391 m away
- 2463 E SH 71 Svrd WbMar 13, 2026Updating an old service that got damaged by a trash truck because overhead was to low replacing 2 disconnects 2 meter base and raising overhead ***per ec: the meters are together but it has 2 different addresses (the ones listed on the espa) but its mounted to the restaurant which is 2463 e sh 71 service road · 398 m away
- 2502 SH 71 SvrdMar 2, 2007A-bia air cargo apron and road development · 431 m away
- 2500 SH 71 SvrdMar 2, 2007Abia-west runway system, fillet widening at taxiway g and t (revision) · 434 m away
- 2512-1/2 Presidential BlvdSep 14, 2026Abia north reclaimed water loop main · 475 m away
- 2751 E SH 71 Svrd WbOct 16, 2025Install illuminated graner by ihg sign cabinet on existing pole · 499 m away
- 2751 SH 71 SvrdMar 2, 2007Austin airport hotel · 499 m away