2502 SH 71 Svrd
Austin, TX 78719
Austin airport site plans for runway, parking and road work
Austin records show site plans filed March 2, 2007, for airport improvements at 2502 SH 71 Svrd. The plans covered the west runway system, a terminal parking lot and storm drainage, a ground transportation staging area, road connections, and additions and renovations to maintenance shops and central stores.
Summarized from City of Austin records · updated Mar 2, 2007
- Projects
- 8
- 8 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsSources: City of Austin
Questions about 2502 SH 71 Svrd
What is being built at 2502 SH 71 Svrd in Austin?
Austin records list airport-related site plans filed March 2, 2007, including runway, parking, road and ground transportation work, plus additions and renovations to maintenance shops and central stores.
When were plans filed for work at 2502 SH 71 Svrd?
The City of Austin records show the site plan cases were filed on March 2, 2007.
Was a new parking lot planned at 2502 SH 71 Svrd?
Yes. Case 153859, “ABIA Terminal Parking Lot and Main Storm Drainage,” was approved and released.
Were runway improvements planned at this Austin airport site?
A site plan for the ABIA west runway system was filed as case 153842 on March 2, 2007. The record lists the case as closed.
Did the plans include road or transportation work?
Yes. The plans included an SH 71/McWhirk connector, Spirit of Texas Drive rehabilitation, and an airport ground transportation staging area. Cases 153858 and 153860 were approved and released.
Were airport maintenance buildings included in the plans?
Yes. Case 153866 covered additions and renovation to the ABIA building maintenance shops and central stores. The case is listed as closed.
Also being built nearby
All of 78719- 2500 SH 71 SvrdMar 2, 2007Abia-west runway system, fillet widening at taxiway g and t (revision) · 7 m away
- 2512-1/2 Presidential BlvdSep 14, 2026Abia north reclaimed water loop main · 47 m away
- 2401 Cardinal LoopJan 21, 2022Starbucks cardinal loop · 115 m away
- 2475 SH 71 SvrdJul 16, 2026Circle k · 130 m away
- 2463 E SH 71 Svrd WbMar 13, 2026Updating an old service that got damaged by a trash truck because overhead was to low replacing 2 disconnects 2 meter base and raising overhead ***per ec: the meters are together but it has 2 different addresses (the ones listed on the espa) but its mounted to the restaurant which is 2463 e sh 71 service road · 142 m away
- 2601 Cardinal LoopNov 17, 2026Aus tenant - sap aus parking phase 2 (revision) · 205 m away
- 2426 Cardinal LoopNov 6, 2026Aus tenant - sap aus parking phase 2 (lot construction) · 284 m away
- 2616-1/2 SH 71 SvrdOct 8, 2026Batx austin airport · 295 m away
- 9518 Hotel DrOct 29, 2015Abia scott airport parking development · 386 m away
- 2705 SH 71 SvrdJul 3, 2019Executesla · 420 m away
- 2454 Cardinal LoopJul 8, 2024Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed · 431 m away
- 9515 Hotel DrMar 2, 2007Hilton hotel at austin-bergstrom international airport · 491 m away